BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Clintwood, Virginia. Completed plans call for site work for a playground / park / athletic field.

W91237-24-Q-0081, John W. Flannagan Reservoir Playground Equipment. Please note the solicitation, all attachments, and extended details are accessible by utilizing the below link which will take you to the PIEE system. Please pay special attention to the instructions to offerors located in the solicitation. Please direct all questions to Ellec T. Robinette at (304) 399-5226 or ellec.t.robinette@usace.army.mil. Contractor shall furnish all equipment and labor to necessary to supply and install three complete commercial playground systems at John W. Flannagan Dam Campgrounds. The playgrounds shall be designed for ages 5-12 and meet safety and design standards for public use playgrounds. The playground equipment and design shall comply with the U.S. Consumer Product Safety Commission- Public Playground Safety Handbook and the (ASTM) Standard Consumer Safety Performance Specifications for Playground Equipment for Public Use and Public Playground The playground systems shall be able to be large enough to fill the established impact area that has been prepared with enough room for required fall zones, Sites 1, 2, and 3 are 50 x 30 ft., approximately 1,500 square feet. Each system shall be 1 complete unit and contain at least 3 attached slides. Site 1 is located in the Lower Twin Campground area, Site 2 is located in the Pound River Campground area, Site 3 is located in the Cranesnest Campground area. The maximum fall heights for equipment shall not exceed 10 ft and contingent upon impact material the depth shall meet standard according to ASTM Standard and Public Playground Safety Handbook. All fall zones around equipment and swings must meet safety requirements in the ASTM Standard and Public Playground Safety Handbook. If the two Safety documents are in conflict the stricter of the two shall be followed. Playground equipment and impact material shall meet accessibility standards in compliance with the Americans with Disabilities Act. A. Contractor shall obtain three differently themed commercial playground equipment plans and specifications that can fit into a 50 by 30 foot impact area with room around equipment to meet necessary fall zone standards in the Safety Handbook. All three playground systems shall be from one playground equipment manufacturer. Contractor shall provide those plans to Project Office for approval prior to purchase. B. All three playgrounds shall have impact materials installed to proper depth for 10ft fall height. The playground in Cranesnest Campground shall have Pour in Place rubber installed at a minimum depth of 5 3/4 " thickness that follows manufacturer recommendations for installation. Pound River Campground and Lower Twin Campground shall have wood mulch installed at a minimum depth of 9". All playgrounds shall have border material installed capable of containing impact materials, designed for that purpose, can be plastic or rubber, wood material not accepted. Drainage shall be installed in playgrounds to prevent standing water. C. Contractor shall purchase the approved, commercial play equipment systems and is responsible for the transportation of the equipment to the three campground areas. All equipment and supplies needed for installation are the responsibility of the contractor. Corps of Engineer staff will provide prepared sites ready for install of the play equipment systems and impact materials. D. Contractor shall install the commercial equipment according to manufacturer specifications and have specific manufacturer accreditations for construction of their equipment to meet warranty and safety requirements.

Post-Bid

Water / Sewer

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
36
Bidding Soon
310
All Active Projects
133
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

Multiple Locations, Clintwood, VA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.