EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 4, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Redlands, California. Completed plans call for site work for a water / sewer project.

Wastewater Treatment Plant Primary Clarifier Upgrade Project. Liquidated Damages $500 per working day Estimated Bid Value $950,000.00. Project Duration 180 working days All questions related to this project shall be directed to Fernando Mata, Project Manager, at 909 841- 3142 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 07/02/2024 at 2:00 PM PT Online Q&A Yes Scope of Services The Work shall consist of furnishing and installing all designated sludge collection, skimming mechanisms, and revolving skimmer pipes with manual operating lever for the rectangular primary clarifiers located at the City's Wastewater Treatment Facility (1950 Nevada St., Redlands, CA 92374). This includes all necessary accessories to ensure a fully functional primary clarifier system at the City of Redlands Wastewater Treatment Facility (WWTF). Sludge collection, skimming mechanism, and skimming pipes with manual lever shall fit existing rectangular clarifiers. The WWTF currently has four rectangular primary clarifiers (PC). Acceptable manufacturers, or equivalents, include Evoqua, Envirex, Viking Chain Enviro Division (a division of Connexus Industries Inc.), Brentwood Polychem Solutions, and Fairfield Service Company. The contractor will need to provide the name and details of the manufacturer.

Award

Water / Sewer

$855,200.00

Public - City

Site Work

3

15

7

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Bonds, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Excavation, Trenching
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
123
Bidding Soon
1,965
All Active Projects
978
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

img_map_placeholder

1950 Nevada St, Redlands, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

WWTP Primary Clarifier Upgrade Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.