BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in West Sacramento, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide planning and engineering services for the development of 6.4 miles of a multi-use trail called the Clarksburg Branch Line Trail. Tasks will include alignment alternatives analysis (last mile), the development and execution of a community-engagement program, project approvals and environmental documentation (PA&ED), plans, specifications, and estimates (PS&E), right-of-way engineering and last-mile property acquisition (R/W) and developing a funding plan for construction and long-term operations and maintenance (O&M). More details on the City's needs for this work are provided in the Scope of Work. Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor." SYNONYMOUS TERMS Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous: a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror b. Purchase Order, Contract, Agreement c. Services, Work, Scope, and Project d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet Question Submission Deadline:July 12, 2024, 5:00pm Question Response Deadline:July 19, 2024, 5:00pm A Proposer may submit Questions related to this RFP to the City through Electronically. The initial term of the Contract is at the City's discretion and may be up to 6 years. The City also reserves the right to extend the Contract for up to 2 additional 1-year terms (individually, "Extension") upon the same terms and conditions as parties agreed to in the Contract. Thus, parties agree the Contract may be for a total of 8 years upon the same terms and conditions as parties agreed in the Contract. Notwithstanding the foregoing, the City is not obligated to extend the Contract for any amount of time. If there is outstanding work within the Scope of Work at the end of the term of the Contract and the City requires time to solicit for and secure an alternative contractor, Contractor shall continue to provide the services within the Scope of Work on a month-to-month basis, not to exceed six (6) months, at the same cost, terms, and conditions in effect at the termination of the Contract. The City shall give Contractor at least thirty (30) days written notice of such a need and the anticipated timeline to secure an alternative contractor. The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this RFP in its entirety. A Proposer must comply with all of the terms and instruction of this RFP, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this RFP may be considered to be nonresponsive and rejected. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the RFP requirements or excuse the Proposer from full compliance with the RFP. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the RFP. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
79
Bidding Soon
1,638
All Active Projects
682
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

img_map_placeholder

Multiple Locations, West Sacramento, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.