BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Walnut, California. Completed plans call for the renovation of a 38,000-square-foot, two-story above grade educational facility.

Work includes surface preparation, surface repair, caulking, sealants, sanding, patching and application of the paint coating to the substrates and systems of Bldg. 80 and associated structures to the building Building 80 houses the Agricultural Sciences classes for Mt. San Antonio College. Constructed in 2011, the 2 story building exterior is approximately 38,000 SQF. The work consists of all preparation for pressure cleaning, caulking/sealing of all cracks, sanding, painting and finishing the exterior surfaces of the building. Exterior painting of building including, but not limited to, all walls, soffits, columns, gutters, downspouts, door and frames, parapet walls, trim, railings, and steel bars where applicable. Without restricting the volume or generality of the above, the work to be performed shall include, but is not limited to the following: o Full power wash of the entire building in preparation for paint. All surfaces to be painted must be pressure washed. The exterior surfaces shall be pressure washed to ensure the removal of dirt, mold, mildew, peeling paint chalk/or any other foreign material. Power wash to include any porch and/or entryways if applicable. o Remove all signs for proper painting. Replace signs when the painting is completed. o Caulk/Seal all gaps/holes/ and/or cracks in the building. Stucco any concrete holes. Sand metal framing o Apply one (1) coat of primer paint, per manufacturer specification, to all surfaces that will be painted. o Sand where necessary to ensure proper adhesion of paint to the surface to ensure a smooth appearance o Apply two (2) coats or per manufacturer specification of Sherwin Williams exterior paint to all walls and soffits. o Apply two (2) coats or per manufacturer specification of Sherwin William exterior paint to all trims. o Apply two (2) coats or per manufacturer specification of Sherwin Williams paint to all doors and railings. Recommendation for Award Date: July 26, 2024. Each Bid Proposal shall be accompanied by Bid Security in the form of: (a) cash, (b) a certified or cashier's check made payable to the District or (c) a Bid Bond, in the form and content attached hereto in the amount of not less than Ten percent (10%) of the total bid price, inclusive of any additive Alternate Bid Item(s) and shall be given as a guarantee that the bidder, if awarded the contract, will execute the agreement within Five (5) working days after notice of award of the contract. The Agreement, which the successful Bidder, as Contractor, will be required to execute along with the forms and amounts of the Labor and Material Payment Bond, Performance Bond and other documents and instruments which will be required to be furnished are included in the Contract Documents and shall be carefully examined by the Bidder. The required number of executed copies of the Agreement and the form and content of the Performance Bond and the Labor and Material Payment Bond and other documents or instruments required at the time of execution of the Agreement are specified in the Supplemental Conditions. Question Deadline 07/18/2024 at 2:00 PM PT Online submission. Pre Qualification Package Due Date :July 18, 2024 email to purconstruction@mtsac.edu with Bid # & Project Name on the subject line The District reserves the right to reject any or all Bid Proposals or to waive any irregularities or informalities in any Bid Proposal or in the bidding. Engineer's Base Bid Estimate: 80,000.00 The work consists of all preparation for pressure cleaning, caulking/sealing of all cracks, sanding, painting and finishing the exterior surfaces of the building. Exterior painting of building including, but not limited to, all walls, soffits, columns, gutters, downspouts, door and frames, parapet walls, trim, railings, and steel bars where applicable. Without restricting the volume or generality of the above, the work to be performed shall include, but is not limited to the following: o Full power wash of the entire building in preparation for paint. All surfaces to be painted must be pressure washed. The exterior surfaces shall be pressure washed to ensure the removal of dirt, mold, mildew, peeling paint chalk/or any other foreign material. Power wash to include any porch and/or entryways if applicable. o Remove all signs for proper painting. Replace signs when the painting is completed. o Caulk/Seal all gaps/holes/ and/or cracks in the building. Stucco any concrete holes. Sand metal framing o Apply one (1) coat of primer paint, per manufacturer specification, to all surfaces that will be painted. o Sand where necessary to ensure proper adhesion of paint to the surface to ensure a smooth appearance o Apply two (2) coats or per manufacturer specification of Sherwin Williams exterior paint to all walls and soffits. o Apply two (2) coats or per manufacturer specification of Sherwin William exterior paint to all trims. o Apply two (2) coats or per manufacturer specification of Sherwin Williams paint to all doors and railings. Further detail given in Sherman Williams Com

Bid Results

Educational

$68,777.00

Public - State/Provincial

Renovation

3

15

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
224
Bidding Soon
3,681
All Active Projects
1,617
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 22, 2024

August 5, 2024

August 20, 2024

img_map_placeholder

1100 N Grand Ave, Walnut, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.