Site work and paving for a road / highway in Juneau, Alaska. Completed plans call for site work for a road / highway; and for paving for a road / highway.
https://mustreadalaska.com/dunleavy-moves-forward-with-new-ferry-terminal-at-cascade-point-to-strengthen-juneau-access-bucks-legislature/ The Alaska Department of Transportation and Public Facilities is advancing plans for a new ferry terminal at Cascade Point, as Gov. Mike Dunleavy works to bring access to Juneau’s capital city. Located at Mile 42 of Glacier Highway, approximately 30 miles north of the current Auke Bay ferry terminal, the Cascade Point site would reduce travel times, improve schedule reliability, and lower operating costs for the Alaska Marine Highway System, according to DOT. The terminal development stems from a 2023 Memorandum of Understanding between the State and Goldbelt, Inc., a Juneau Alaska Native corporation. Goldbelt owns the surrounding lands, and the agreement established a public-private partnership designed to promote economic opportunity. DOT is now entering a design-build procurement process for Phase 1 of the terminal, using state funds previously appropriated for the Juneau Access project. These funds are restricted for use in the Lynn Canal corridor, making the Cascade Point project a suitable match without requiring new federal spending or triggering significant delays. The Legislature’s final budget cut money from the Juneau Access project, but that can be vetoed by Gov. Mike Dunleavy. There was originally over $40 million in a fund for the project — a fund that has been sitting there for more than a decade. The Senate Finance Committee in May took $37 million previously allocated for the project. The press release from the Department of Transportation indicates that the Dunleavy Administration is not going to allow that reappropriation of funds. Juneau’s Sen. Jesse Kiehl, who sits on the Finance Committee, barely put up a fight for his district. Paulette Simpson: RIP Juneau Access But Dunleavy appears to be forging ahead on Juneau Access. According to DOT, the proposed Cascade Point terminal will: Reduce round-trip transit times to Haines and Skagway by over two hours; Lower vessel fuel use and operating costs; Increase the ability of the AMHS to run more frequent trips during peak travel seasons; Improve schedule reliability by reducing exposure to challenging marine weather conditions. These improvements align with findings from the 2020 AMHS Reshaping Work Group Report, which recommended Cascade Point as a viable way to modernize service. The 2045 AMHS Long-Range Plan also noted Cascade Point as a potential future asset, pending feasibility analysis. That technical work has now confirmed the site meets engineering standards for ferry operations. Cascade Point is not intended to replace the Auke Bay terminal but rather to supplement it, offering greater operational flexibility and resilience. Officials say the dual-terminal model will allow the ferry system to adapt more effectively to seasonal surges and unforeseen service interruptions. The concept for a terminal at Cascade Point has been under discussion for nearly two decades and gained new momentum in recent years. Since 2022, DOT and Goldbelt have worked together on environmental reviews, engineering designs, and land use planning. As the project progresses, DOT says it remains committed to public interest and engagement in the planning process. “Cascade Point reflects smart planning, strong collaboration, and the Governor’s direction to deliver meaningful transportation improvements for Southeast Alaska,” Commissioner Ryan Anderson said. More information on the design-build contract and project timeline is expected to be released in the coming weeks. ---------------------------------------------------------------------- This project will design and construct a chip seal overlay on Glacier Highway, between Brotherhood Bridge & the AMHS Ferry Terminal in Auke Bay. Project no.0933039/Z684710000 Engineer's Estimate Range Between : $1,000,000 and $2,500,000 To be responsive, a bid must include a bid guaranty equal to 5% of the amount bid, The apparent successful bidder must furnish a payment bond in the amount of 100% of the contract and a performance bond in the amount of 100% of the contract as security conditioned for the full, complete and faithful performance of the contract All work shall be completed in N/A Calendar Days, or by August 30, 2026 If a bidder has a question relating to design features, constructability, quantities, or other technical aspects of the project, it may direct its inquiry to the questions and answers area of the Bid Express proposal page: __________________________ Vernon Perry Phone: (907) 465-1812 Construction Project Manager, PO Box 112506, Juneau, AK. 99811-2506 Fax: (907) 465-4493 E-Mail: vernon.perry@Alaska.gov A bidder requesting assistance in viewing the project site must make arrangements at least 48 hours in advance. The point of contract for inquiries for this project is Vernon Perry__________________________________________. Email: vernon.perry@Alaska.gov Phone: (907) 465-1812 For questions relating to electronic bidding or for assistance with your Bid Express account, contact Bid Express customer support at customer.support@bidx.com or call toll free (888)352-BIDX(2439) Monday through Friday 7:00am to 8:00pm (Eastern). A bidder may direct questions concerning bidding procedures and requirements to: Email: srdotpfcontracts@alaska.gov Phone: (907) 465-4493 AKDOT - Cummings Road Surfacing Upgrades *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$2,492,410.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
July 21, 2025
Glacier Hwy, Juneau, AK
Related To This Project
Juneau, AK
--
Juneau, AK
Bid Date: Oct 22 2025
Juneau, AK
Bid Date: Nov 20 2025
Juneau, AK
--
Juneau, AK
Bid Date: Dec 04 2025
Juneau, AK
Bid Date: Jul 30 2024
Juneau, AK
Bid Date: Aug 05 2024
Juneau, AK
Bid Date: Oct 29 2024
Juneau, AK
Bid Date: Jul 11 2024
Juneau, AK
--
Juneau, AK
Bid Date: Jun 12 2024
Juneau, AK
Bid Date: Jun 11 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.