BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2024 at 8:00 PM

Updated September 19, 2024

Site work for a playground / park / athletic field in Newport, Oregon. Completed plans call for site work for a playground / park / athletic field.

State of Oregon Parks and Recreation Department yaquina Bay Lighthouse Exterior Rehabilitation at Yquina Bay State Recreation Area The following is a project estimate for bonding purposes: $700,000.00 to 1,000,000.00 Question Deadline Jul 31, 2024 at 2:00 PM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT DESCRIPTION: Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and permits required to complete the Project as more fully described in the Contract Documents, including: Exterior rehabilitation of the Yaquina Bay Lighthouse, which is the complete above-ground exterior restoration of the lighthouse and is summarized as the work required to protect the site, deconstruct the roofing, lighthouse lantern, windows, doors, and areas of siding. Work to include the repair of roof framing, chimneys, brick foundation, lantern, siding, doors, and windows with the installation of a new roof and complete exterior paint coatings. The Work to be performed under this Contract shall consist of furnishing tools, equipment, materials, supplies, and manufactured articles and for furnishing transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. PROJECT LOCATION: The Work will take place in Lincoln County, Oregon, BOLI region 4. Yaquina Bay Lighthouse Newport, Oregon 97365 DESCRIPTION OF WORK Exterior rehabilitation of the Yaquina Bay Lighthouse - POP 23-25 is the complete above-ground exterior restoration and is summarized as the work required to protect the site, deconstruct the roofing, lighthouse lantern, windows, doors, and areas of siding. Work to include the repair of roof framing, chimneys, brick foundation, lantern, siding, doors, and windows with the installation of a new roof and complete exterior paint coatings. A. The Work shall be as shown on the Plans and as specified herein at the following location(s): 1. Yaquina Bay State Recreation Site, Newport, OR B. Contractor shall furnish all permits, labor, equipment, tools, supervision, materials and incidentals required to complete the Work in accordance with the Plans, Specifications and terms of the Contract. Also refer to the Contract Documents for additional requirements and information. Work includes, but is not limited to, the following: 1. Mobilization/Overhead. 2. Site Protection and Work Platforms 3. Deconstruction and Material Salvage. 4. Carpentry Repairs and structural improvements. 5. Masonry Repairs and Repointing. 6. Exterior Painting and Wood Coatings. 7. Sheet metal roof flashings, gutters, downspouts, chimney caps and related work. 8. Roofing Preparation and Installation of new roofing. 9. Cast Iron / Steel repair and fabrication for restoration of the Lantern. 10. Wood window restoration and shutters.

Award

Playgrounds / Parks / Athletic Fields

$1,600,000.00

Public - State/Provincial

Site Work

36

25

51

9

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
56
Bidding Soon
806
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 14, 2024

Project location map

846 SW Government St, Newport, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.