BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Lee, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The Town of Lee, Massachusetts requests quotations for the following services at Lee Skate Park at the Lee Athletic Field, located at 126 Housatonic Street (Map 19, Lot 1), at the west side of the Housatonic Street: 1. Install MADEP File Number sign. 2. Install erosion control. 3. Appear before the Lee Conservation Commission prior to starting work. 4. Remove the Lee Skate Park sign. 5. Excavate soil as needed at the skate park. 6. Install additional concrete at skate park, pitched toward the trench. 7. Install 2' wide x 1' deep stone infiltration trench adjacent to skate park. 8. Paint or otherwise mark an outline of the original skate loop to provide skaters the option of following the previous track flow. 9. Reinstall the Lee Skate Park sign. 10. Restore all disturbed areas to pre-construction conditions. 11. Schedule a site visit for the Conservation Commission upon completion of all site work. 12. Remove erosion control once site is stabilized. The current footprint of the Lee Skate Park is 4,055+- s.f. (without elevation). The expansion of the skate park will add 3,745+- s.f. of usable skate area. The final dimension of the skate park after the expansion will be 120'+- x 65'+-. Contractor shall supply 4,000 psi concrete with 3/4" aggregate and 4-5" slump. Contractor shall place concrete over a 6" thick base of crushed stone. Control joints shall be installed to match the existing configuration. The surface shall be similar to the existing surface with a smooth uniform trowel finish. Additionally, Contractor shall reinforce the concrete with welded wire mesh 6"x6" x 10 gauge. Contractor shall pin the new concrete slab to the existing slab with 1/2"x8" dowels spaced at 24" on center". All of the work will occur within existing lawn areas and no trees will be removed. The entire site is located within the 100 year floodplain. A portion of the work is located within the 100' buffer zone of a nearby wetlands.. Services must be completed no later than April 30, 2025 The Town of Lee reserves the right to refuse all quotations.

Post-Bid

Playgrounds / Parks / Athletic Fields

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
121
Bidding Soon
2,129
All Active Projects
947
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

September 30, 2024

img_map_placeholder

126 Housatonic St, Lee, MA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.