Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2025 at 7:00 PM
Updated March 4, 2025
This is a service / maintenance or supply contract in Lee, Massachusetts. Contact the soliciting agency for additional information.
The Town of Lee, Department of Public Works requests a three-year proposal for the transportation and disposal of sludge from its Wastewater Treatment Plant. The Town of Lee, Massachusetts invites sealed proposals for the removal and disposal of liquid wastewater sludge with an average solids content of 3% to 6%. The Town of Lee, as the Awarding Authority, invites Sealed Proposals for the removal and proper disposal of sewage sludge generated in and by the Town of Lee at the Town's municipal Wastewater Treatment Facility (WWTF) located off Route 102 in Lee (379 Pleasant St Lee, MA) Massachusetts. Wastewater treatment at this facility is a Sequential Batch Reactor (SBR). Sludge processing at the WWTF consists of thickening waste activated sludge followed by the addition of chemicals, and by dewatering through a rotary drum thickener. The Town reserves the right to reject any and all proposals in whole or in part and to waive minor informalities when, at its sole discretion, said action is deemed to be in the best interest of the Town. Bid Security. Security deposits will be required, to be submitted with the Proposal, in the form of Bid Bond, certified check or cashier's check from a recognized bank, trust company or institution in the amount of five percent (5%) of the total bid price for the Contract term, payable to the Town of lee. Should any Bidder to whom an award is made fail to enter into a Contract with the Town of lee within ten (10) days of the Notice of Award is issued or fail within such time to furnish payment and performance bonds as required, the amount of the Bid Security shall become the property of the Town of Lee as liquidated damages for such failure. Thereafter, the Town of Lee may proceed to award the Contract to the next lowest responsible Bidder. The successful Bidder will be required to furnish Payment and Performance Bonds, satisfactory to the Town and Town Counsel, specifying both the Contractor and all Sub-Contractors, in the amount of one hundred percent (100%) of the three year contract term no later than ten (10) days after the issuance of the Notice of Award.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2025
April 2, 2025
379 Pleasant St, Lee, MA
Related To This Project
Lee, MA
Bid Date: Feb 26 2025
Lee, MA
Bid Date: Apr 02 2025
Lee, MA
Bid Date: Apr 30 2025
Lee, MA
Bid Date: Apr 30 2025
Lee, MA
--
Lee, MA
Bid Date: May 06 2025
Lee, MA
Bid Date: Apr 28 2025
Lee, MA
Bid Date: May 06 2025
Lee, MA
Bid Date: Nov 21 2024
Lee, MA
Bid Date: Oct 30 2024
Lee, MA
Bid Date: Aug 30 2024
Lee, MA
Bid Date: Jun 28 2024
Lee, MA
Bid Date: Jun 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
