BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work for a civil project in Washington, Missouri. Design plans call for site work for a road / highway; and water / sewer project.

As of September 3, 2025, per owner, engineer was identified. They are anticipating going out to bid this fall and construction this winter. The City of Washington is requesting the services of a consulting engineering firm to perform the described professional services for the project included on the attached list. If your firm would like to be considered for these consulting services, you may express your interest by responding to the appropriate office, which is indicated on the attachments. Limit your letter of interest to no more than 5 pages. This letter should include any information which might help us in the selection process, such as the persons or team you would assign to each project, the backgrounds of those individuals and other projects your company has recently completed or are now active. It is required that your firm's Statement of Qualifications (RSMo 8.285 through 8.291) be submitted with your firm's Letter of Interest or be on file with the City of Washington. The statement of qualification is not included in the total page count limit. Location: First Location: North of Eighth Street between, Jefferson Street and Locust Street. Second Location: East of High Street between W, 14th Street and Westridge Drive. Proposed Improvement: Retrofit current stormwater flood control basins to treat for water quality. Water quality treated through bioretention basin, extended detention, or other methods. Design will have to include current flood control requirements as well as providing Water Quality volume treatment. Design will need to provide positive aesthetics. Area: Approx. 14,000SF - 8th St.: 20,000SF - High St. Approximate Construction Cost: $250,000 Anticipated Construction Schedule: Begin Construction summer 2025 Consultant Services Required: The engineering responsibilities may include but are not limited to the following: The preparation of Conceptual plans, Preliminary Plans, Contract plans and Right of Way Plans. Design services may include, right of way plans, surveying, geotechnical investigations, subsurface utility exploration, public involvement, environmental and historic preservation services/permits, contract documents, assisting with the bidding process, construction support/construction inspection, utility coordination/permits and traffic controls including the preparation of PS&E and final documents. The method of Contractor Selection has not been Determined at this time

Design

Roads / Highways

$250,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
181
Bidding Soon
1,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2025

Project location map

Multiple Locations, Washington, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.