BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in San Diego, California. Working plans call for the renovation of a educational facility.

Job No: 16-016 *This is a LLB project. Only LLB Prime Contractors listed below may submit proposals to the San Diego Unified School District. Only proposals from the following Group H LLB Prime Contractors will be accepted: • Balfour Beatty Construction, LLC • Barnhart-Reese Construction, Inc. • Bernards Bros, Inc. • BN Builders • Core West, Inc. • C.W. Driver, LLC • Erickson – Hall Construction Co. • Flint Design Build, LLC., dba Flint • Level 10 Construction LP • Nexgen Building Group, Inc. • PCL Construction Services, Inc. • SOLPAC Construction, Inc., dba Soltek Pacific Construction Company • Swinerton Builders • Sundt Construction, Inc • Turner Construction Company Rolando Park Elementary School WSM LLB - LB25-0263-39-00-P1: future construction estimate is $23,400,000. The anticipated duration for preconstruction services is fourteen (14) months with construction beginning November 2025. Under Public Contract Code 3400, the District has made a finding that the following particular materials, products, things, or services are designated by specific brand or trade name in order to match other products in use on the particular public improvement either completed or in the course of completion for: Rolando Park Elementary School Whole Site Modernization Project (CONSTRUCTION) - Division 1-33 - DSA # TBD. The future construction phase may contain some or all of the following proprietary specifications to be determined after DSA has approved the plans and the awarded Contractor and District agree on the timing and structure to advertise and solicit subcontractor pricing as part of the future GMPs: 03 30 00 Cast-In-Place Concrete 07 26 13 Vapor Reduction Systems 08 71 00 Door Hardware 09 68 16-1A Sheet Carpet 09 68 16-1B Sheet Carpet 11 68 16 Play Structures 27 41 16 Audio Visual Infrastructure 28 13 00 Access Control 28 31 11 Digital Addressable Fire Alarm System 28 46 21.11 Addressable Fire-Alarm Systems 32 18 13 Synthetic Turf/Grass Surfacing 32 84 00 Planting Irrigation 32 84 01 Field Cooling System Check payable to San Diego Unified School District. If allowed, refunds will be processed by the District only if the Documents, including addenda, are returned intact and in good order to Crisp Imaging within ten (10) days of the issuance of the Final Results on the day after Board Award (September 24, 2024). Prequalifications for the District are not due at this time. Subcontractor prequalifications will be due at the Guaranteed Maximum Price phase of the project. Effective March 1, 2024, any solicitation opening after March 1, 2024, will no longer require Non-MEP prequalification. MEP (Mechanical/Electrical/Plumbing): Subcontractors performing work under one or more of the following license classifications: A or B, and/or performing work of C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 should submit their prequalification application online. MEP prequalifications must be renewed annually on the approval anniversary. Bids will not be accepted from non-prequalified MEP subcontractors. Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the proposer is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. This is a PSA project and requires prequalification. The District requires that subcontractors possess the appropriate classification(s) of California State Contractors License(s), valid and in good standing, at the time of best value analysis and contract award. The LLB Prime Contractor is required to possess B or other appropriate license, subject to District. The District reserves the right to reject any and all proposals and to waive any irregularities or informalities in any proposals or in the bidding process. No LLB Prime Contractor may withdraw his proposal for a period of 90 days after the District receives proposals.

Final Planning

Educational

$23,400,000.00

Public - City

Renovation

1057

44

9

8

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
61
Bidding Soon
834
All Active Projects
377
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

November 21, 2025

img_map_placeholder

6620 Marlowe Dr, San Diego, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.