BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2024 at 8:00 PM

Updated August 9, 2024

Renovation of a water / sewer project in Westminster, Massachusetts. Completed plans call for the renovation of a water / sewer project.

Replacement of 17,000 SF roof with PVC membrane roof and selective demolition and repairs to masononry walls. The Scope of Work Includes Roof Replacement and Masonry Walls Repairs. Project Location: 18 Hager Park Rd, Westminster, Ma 01473 Estimated Construction Cost: $675,000.00 The Required Contract Completion Period is 80 Consecutive Days as Specified in Section 00 52 00, Agreement. Bid Security for All General Bidders and Sub-bidders in the Form of a Bid Bond, Cash, Certified Check, Treasurer's or Cashier's Check, Payable to the Owner, is Required in the Amount of 5 Percent of the Total Bid, in Accordance With the Conditions in Section 00 21 13 Instructions for Bidders. Sub-bids 2a - Masonry - Division 4 the City of Fitchburg Reserves the Right to Waive Any Informalities or Irregularities in the Bids Received, or to Reject Any and All Bids, Wholly or in Part. The Selected Contractor Shall Furnish a Performance Bond and a Payment Bond in Amount at Least Equal to One Hundred Percent (100%) of the Contract Price as Specified in Section 00 72 00, General Conditions.

Post-Bid

Water / Sewer

$675,000.00

Public - City

Renovation

11

18

4

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
627
Active Projects
271
Bidding Soon
4,169
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

September 6, 2024

Project location map

18 Hager Park Rd, Westminster, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.