BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2024 at 8:00 PM

Updated July 22, 2025

Site work, paving and outdoor lighting for a civil project in Grand Ridge, Florida. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

Counties: Jackson Call Order: 008 Road Name: SR 10 (US 90) Limits: At SR 69 (Porter Ave) Project(s): 44560215201(*) Federal Aid No: D324088B Total Roadway Length: 0.223 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.223 Miles Contract Days: 168 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The Improvements under this Contract consist of left turn lane improvements, signing and pavement marking, signalization and lighting for intersection safety improvements on SR 10 at SR 69 (Porter Avenue) in Jackson County, Florida. Question Deadline 08/21/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 008 - Traffic Signal / Electrical - SR 10 (US 90)

Award

Roads / Highways

$2,093,575.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

36

5

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
38
Bidding Soon
694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

October 28, 2024

Project location map

FL-10 & FL-69, Grand Ridge, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.