BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in St Petersburg, Florida. Completed plans call for site work for a water / sewer project.

St. Petersburg Chiller Plant Replacement. All work performed on this project shall be done in accordance with all the Contract Documents referenced, attached to the MyFloridaMarketPlace Vendor Information Portal (MFMP VIP) advertisement, and contained herein, including those documents received as a result of the submission of the Confidentiality Exemption Form (Attachment A). See Exhibit 2 in the Terms and Conditions for pricing breakdown. The purpose of this Invitation to Bid (ITB) is to obtain competitive pricing for the replacement of Chiller #3 and related pumps. Additionally, we will connect to the new building automation system, per plans and specifications, in accordance with the contract documents and Chapter 255 of the Florida Statutes. Deadline for Questions Must be received PRIOR to: October 17, 2024 @ 5:00 PM ET On projects where the base bid and sum of all additive alternates exceeds $100,000.00 the bid shall be accompanied by a bid guarantee (bid bond) of not less than five (5) percent of the amount of the bid. Contractor shall furnish the Owner’s Contract/Project Manager with a 100% Performance Bond and 100% Labor and Material Payment Bond for any contracts in excess of $100,000 and shall be written by a Surety Company acceptable to Owner and authorized to do business in the State of Florida and signed by a Florida Licensed Resident Agent. Contractor is required to furnish replacement bonds in the event of cancellation of the original Performance Bond and Labor and Material Payment Bond Documents may include but are not limited to: o Any Modifications o Agreement (Exhibit 1 in the Terms & Conditions) o Addenda o Terms and Conditions o Invitation to Bid o Drawings and Specifications o Permits The Commission has an estimated budget for this project of $2,700,000. LOCATION: 100 Eighth Avenue SE, St. Petersburg, FL 33701 In accordance with the General Terms and Conditions, the number of days from Notice to Proceed with Construction to Substantial Completion shall be two hundred and seventy (270) calendar days and Final Completion shall be thirty (30) calendar days thereafter. The mobilization day will be at the discretion of the Contract/Project Manager.

Post-Bid

Water / Sewer

$2,700,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
48
Bidding Soon
927
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 29, 2024

img_map_placeholder

100 8th Ave SE, St Petersburg, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.