Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in St Petersburg, Florida. Completed plans call for the renovation of a municipal facility.
The St Petersburg VARO has 355 existing motorized hurricane shutters that at the push of a button will raise or lower in a sequential order. The contractor shall provide all supervision, labor, administrative support, materials, tools, parts, supplies, equipment, and transportation necessary for the completion of a project to correct deficiencies found during the most recent test of the hurricane shutters. The scope of the work includes but is not limited to the repair or replacement of twenty-four (24) non-performing motorized hurricane shutters covering 4' by 8' windows. The contractor shall perform maintenance on the twenty-four identified hurricane shutters, ensuring all shutters are responsive to master commands from the master controllers, which are operated by Metasys, a proprietary program of Johnson Controls Inc. Some shutters are capable of independent operation, but will require controls and/or electrical rework to be responsive to master commands. Contractor shall: a. Conduct field site survey to verify measurements, locations, and site conditions for twenty-four (24) non-performing motorized hurricane shutters at the VARO St. Petersburg, Florida. b. Repair twenty-four (24) existing non-performing motorized hurricane shutters, which may include replacing the shutter motor, relay, manual crank, and/or intermediate switch. c. Ensure twenty-four (24) repaired motorized hurricane shutters are tied into the existing building circuit grid (Metasys) so they raise and lower in sequential order (first floor shutters are exempt). d. Provide required lift to access windows as required. e. Clean and lubricate the twenty-four (24) shutters identified. f. Properly dispose of the old residual parts. g. Ensure construction area is free of trash and debris upon completion of this project. The contractor shall be responsible for fixing/repair any damages to the building or any landscaping which occurs because of operating the lift on site. Damaged items shall be returned to their original state or better. If required, Contractor shall coordinate with the system integrator involved in any new and additional component implementation to ensure that any project related warranty and contractual service on new hardware/software remains in force. Due to the hurricane season having begun in the region, shutter maintenance shall be conducted ASAP. Additional specifications for this requirement are detailed in the attached statement of work (SOW) which has been incorporated into the RFQ.
Post-Bid
Municipal
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2024
August 1, 2024
9500 Bay Pines Blvd, St Petersburg, FL
Related To This Project
St Petersburg, FL
Bid Date: Aug 05 2024
St Petersburg, FL
Bid Date: Nov 12 2024
St Petersburg, FL
Bid Date: Aug 28 2024
St Petersburg, FL
Bid Date: Aug 29 2024
St Petersburg, FL
Bid Date: Oct 30 2024
St Petersburg, FL
Bid Date: Aug 21 2024
St Petersburg, FL
Bid Date: Aug 13 2024
St Petersburg, FL
Bid Date: Jul 26 2024
St Petersburg, FL
Bid Date: Jul 16 2024
St Petersburg, FL
Bid Date: Aug 08 2024
St Petersburg, FL
Bid Date: Aug 06 2024
St Petersburg, FL
--
St Petersburg, FL
--
St Petersburg, FL
Bid Date: Aug 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.