Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2024 at 8:00 PM

Updated August 23, 2024

Site work for a civil project in Womac, Illinois. Completed plans call for site work for a water / sewer project.

Schien Elevated Storage Tank Rehabilitation Project for rehabilitation work on a 300k gallon water storage tower, including ladder repairs, manhole addition, vent replacement, interior painting and coating, and the addition of an active mixer in the tank. This project also includes adding an active mixer to a 1 MG ground storage tank and bid alternates for the exterior coating of the 300k gallon storage tower. Substantial Completion: within 60 days. Final Completion: within 90 days. Bidding is per 30 ILCS 500 and 557 and any resulting Contract is subject to applicable provisions of the Illinois Compiled Statutes (ILCS) and municipal codes and ordinances. Bid security at 5% of total Bid. A Pre-Bid conference will not be held. Question Deadline 08/14/2024 at 8:00 AM CT DESCRIPTION OF THE WORK A. The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features. 1. Relocation and permanent affixing of access ladder on the elevated tower 2. Addition of manway in riser on the elevated tower 3. Repair of interior ladder on the elevated tower 4. New OSHA approved safety cable lining systems on the elevated tower 5. Catwalk ladder transition modification on the elevated tower 6. Latches for locking hatch and ladder guard on the elevated tower 7. Replace vent flange and vent on the elevated tower 8. Full interior coatings work on the elevated tower 9. Installation of active mixing systems to both elevated and ground storage tanks and all material and equipment, construction and services inherent to the Work. Alternates (if awarded by Owner) o Alternate A: Exterior overcoat o Alternate B: Complete exterior coating removal and re-coating and painting. B. Work Site locations: The Work will be at the elevated and Ground Schien Storage Tanks in Carlinville, IL. The elevated storage tank is located behind Carlinville Truck Equipment, Inc located at 20868 University St, Carlinville, IL 62626. The ground storage tank is located at behind Demuzio Excavating, Inc at 14841 JD Dr, Carlinville, IL 62626. A location reference map is provided in 00 31 00.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
99
Bidding Soon
1,635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

Project location map

Multiple Locations, Womac, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed