Site work and paving for a mixed-use development in Santa Rosa, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Project Description: The purpose is to reconstruct and rehabilitate Fulton Road between Guerneville Road and Piner Road to a four-lane regional/arterial street as envisioned in the Santa Rosa General Plan. The project will increase the safety of cyclists and resolve congestion on one of the city's main corridors. The project will increase the number of travel lanes, add a bicycle lane, and sidewalks to both sides of Fulton Road. Approximately 0.88 acre of new impervious area will result from the widening and improvements along the entire length of the project. The project will involve demolition, clearing, excavation, grading, trenching, paving, and roadway construction. The construction area for the project is approximately 12.5 acres. The majority of the widening will occur along the west side of Fulton Road. Existing storm drainpipes that discharge to Forestview Creek will be reconstructed. Two existing 41-inch by 72-inch corrugated metal oval storm drainpipes will be replaced with a box culvert system. An existing 42-inch storm drain and a 30-inch storm drain will connect to the box culvert on either side. Rock slope protection will be placed in the channel to approximately 10-feet beyond the end of the pipes. The project will extend two existing 60-inch diameter stormwater culverts in Peterson Creek by approximately 5-10 feet and replace a roadside ditch draining to Peterson Creek with a new 36-inch storm drainpipe. Rock slope protection would be placed within the Peterson Creek channel to approximately 15 feet beyond the end of the pipes. Stormwater improvements also include installation of additional short segments of pipe along certain sections of the corridor Project Information. Location and Description. The Project is located at 55 Stony Point Road, Santa Rosa, CA 95401, and is described as follows: A bio-retention facility will be constructed in the corporation yard to provide stormwater treatment and retention for the existing parking lot, storage yard area, and surrounding buildings. Time for Final Completion. The Project must be fully completed within 60 Working Days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about April 30, 2025, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Estimated Cost. The estimated construction cost is $453,059. Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. Construction Timing: Construction is anticipated to occur between 2021 and 2023 and take approximately 24 months to complete. Question Deadline 02/24/2025 Bidders should be submitted any inquires via Planetbids platform at least five working days before the schedule bid opening.
Award
Water / Sewer
$567,912.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2025
April 30, 2025
55 Stony Point Rd, Santa Rosa, CA
Related To This Project
Santa Rosa, CA
Bid Date: Aug 21 2024
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Aug 30 2024
Santa Rosa, CA
--
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Sep 24 2024
Santa Rosa, CA
Bid Date: Sep 18 2024
Santa Rosa, CA
Bid Date: Oct 02 2024
Santa Rosa, CA
Bid Date: Aug 19 2024
Santa Rosa, CA
Bid Date: Aug 27 2024
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Aug 14 2024
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Jul 03 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.