EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 27, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a library in Lock Haven, Pennsylvania. Completed plans call for the renovation of a library.

Annie Halenbake Ross Library - HVAC Replacement. Question Deadline 08/09/2024 at 12:00 PM ET Any Questions During the Bidding Process Shall Be in Writing and Emailed to the City of Lock Haven, Contact: Abigail Roberts (Aroberts@lockhavenpa.gov) and the Engineer's Office, Contact: W. Andrew Arnold, P.e. (Warnold@gdfengineers.com). The Deadline for All Questions at online. No Questions Received. The Bid Award Will Be Considered at the Regularly Scheduled Meeting of City Council on August 19, 2024 After 7:00 Pm. The Project Consists of the Demolition of the Existing Third Floor Split System and Associated Piping, Ductwork and Appurtenances, Installation of New Split System Limits and Associated Piping, Ductwork and Appurtenances, and Demolition and Installation of a New Control System and All Required Appurtenances. Each Bid Must Be Accompanied by a Certified or Bank Check or Bid Bond Naming as Payee or Obligee, the City of Lock Haven, in the Amount of Ten Percent (10%) of the Total Bid Amount as Security for Proper Execution of the Agreement and Submitting Other Documents as Required by the Contract Documents. No Bids May Be Withdrawn, Except When the Bidder Complies With the Requirements of Act No. 4 of the General Assembly of Pennsylvania, Senate Bill 793, as Amended. The Successful Bidder Will Be Required to Execute the Agreement and to Furnish Performance and Payment Bonds in the Amount of One Hundred Percent (100%) of the Total Contract Price. The Contractor Will Also Furnish Evidence of Required Insurance Coverage. the City of Lock Haven Reserves the Right to Reject Any or All Bids or Parts Thereof or Items Therein, to Waive Any Defects or Irregularities in the Bids, and to Accept Any Bid Which, in Its Judgment, is in Its Best Interest. Bids Shall Remain Open for a Period of Sixty (60) Days From the Date of Bid Opening.

Award

Library

$61,592.00

Public - City

Renovation

6

15

2

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Field Samples, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Public Address and Mass Notification Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
49
Bidding Soon
684
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

img_map_placeholder

232 W Main St, Lock Haven, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Annie Halenbake Ross Library HVAC Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.