BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Calabasas, California. Contact the soliciting agency for additional information.

The Las Virgenes Municipal Water District is requesting proposals for Pure Water Project Las Virgenes - Triunfo Project Construction Outreach and General Outreach "On Call" Services For questions, please contact Mike McNutt ((818) 251-2124 or mmcnutt@lvmwd.com The proposed scope of work includes the following tasks; however, the consultant can include additional tasks as appropriate: o Kickoff Meeting with District/JPA staff o Planning and management of a Beer Brew and Tasting Event with the following constraints: 1 o Beer will have already been brewed and canned by a local brewery. o Help identify and hold the event at a location within the JPA service area other than on JPA/ District facilities (due to restrictions on serving alcohol on District/JPA property). o Limit the event to 200 participants (District to develop guest list) or no more than the capacity that the event location allows. o Follow-up with invitees and confirm attendance. o Procure any permits and insurance that may be required for the event. o Run the event from beginning to end. o Provide any other event needs such as, but not limited to, musical entertainment, audio system for addressing the audience, and possible raffle prizes. o Planning and management of a Coffee Brew and Hot Chocolate Tasting Event with the following constraints: o Solicit participation from primarily local coffee makers within the JPA service area o Identify and hold the event in Oak Park, CA in a park or at a specific business location TBD. o Limit the event to 200 participants (District to develop guest list). o Follow-up with invitees and confirm attendance. o Coordinate with District staff to possibly staff a table at the event. o Provide any other event needs such as, but not limited to, musical entertainment, audio system for addressing the audience, and possible raffle prizes. o Run the event from beginning to end. o Planning, managing and executing an outreach plan specific to the construction of the full-scale advanced water purification facility and the corresponding pipe construction project: o Develop an outreach plan for education and information dissemination to the residents and businesses that will be impacted by the construction of the project. This can include: Timeline for construction phases (standalone leave behind) o Graphic depictions of construction phases included Door knocking for homes and businesses that will be directly impacted by the construction of the facility and pipeline and staff to implement door knocking process. Any physical signage to be strategically placed along construction impacted routes. A plan to help disrupted business get free advertising during construction phases (social media posts, a "construction" slogan and hashtag to be shared, newspaper advertisements, billboards, etc...) Assistance in creating videos, collateral, and graphics for use in community newsletters, websites, social media platforms, and any other outreach tool that will assist in information dissemination. Include a timeline of outreach triggers for the execution of specific components of the outreach plan o Create an outreach brochure for the pipeline and facility construction including: o Timeline o Reasoning for project o Graphics 2 o Map of JPA facilities and how the treatment process will work at each location, showing flow of water between facilities, etc... o Final rendering of the full-scale facility o "On call" services that can include: o Video creation o Graphic design needs o Emergency outreach staffing or assistance in responding to a problem o Development of press releases, letters to the editor, social media content, articles for publication in magazines (industry and local) o Facilitating tours of impacted construction areas for elected officials, residents and business owners o Assistance in setting up and managing "hybrid "town hall" meetings about the project and the construction phases (JPA staff will facilitate and run meetings) o Assist in garnering public speaking engagements for JPA staff to give o Any other related needs that may arise specific to the advanced water purification facility and pipeline construction phases (October 2024 - November 2030)

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
107
Bidding Soon
1,924
All Active Projects
867
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

September 30, 2024

img_map_placeholder

To Be Determined, Calabasas, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.