Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 18, 2024 at 7:00 PM
Updated December 19, 2024
Renovation of a water / sewer project in Calabasas, California. Completed plans call for the renovation of a water / sewer project.
For questions regarding this RFP, please contact Veronica Hurtado (818) 251-2332 or Burton Bril, Chief Plant Operator, (818) 251-2328. The Las Virgenes Municipal Water District (District) is requesting proposals for odor control tower carbon replacement at the Tapia Water Reclamation Facility located at 731 Malibu Canyon Road, Calabasas, CA. The scope of work is turnkey and includes the provision of all materials and equipment for the removal and disposal of spent activated carbon, and provision and placement of new activated carbon in the odor control towers. The work will be performed on headworks odor control tower No. 3, primary Towers No. 2 and No. 3 and two (2) lift station odor control vessels. A drawing showing the location of the odor control towers at the Tapia Water Reclamation Facility is provided for reference SCOPE OF WORK The scope of work includes the removal and disposal of spent carbon and the supply and placement of new carbon (turnkey) as specified for each vessel as shown below: 1. Headworks carbon tower No. 3: 18,000 lb. dual bed. Use 4 x 8 coconut shell reactivated carbon. 2. Primary carbon tower No. 2: 6,000 lb. dual bed. Use 4 x 8 coconut shell reactivated carbon. 3. Primary carbon tower No. 3: 6,000 lb. dual bed. Use 5,000 lb. 4 x 8 virgin high capacity H2S activated carbon and 1,000 lb. 4 x 8 virgin coconut shell granular activated carbon. 4. Two lift station vessels: 600 lb. each. Use 4 x 8 virgin high capacity H2S activated carbon. Timing: Work shall be completed within 4 months of award of purchase order. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $50,000-$75,000
Award
Water / Sewer
$48,995.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2024
December 19, 2024
731 Malibu Canyon Rd, Calabasas, CA
Related To This Project
Calabasas, CA
Bid Date: Nov 12 2024
Calabasas, CA
Bid Date: Oct 31 2024
Calabasas, CA
Bid Date: Nov 14 2024
Calabasas, CA
Bid Date: Oct 31 2024
Calabasas, CA
Bid Date: Dec 27 2024
Calabasas, CA
Bid Date: Jan 07 2025
Calabasas, CA
Bid Date: Jan 06 2025
Calabasas, CA
Bid Date: Oct 01 2024
Calabasas, CA
--
Calabasas, CA
--
Calabasas, CA
--
Calabasas, CA
Bid Date: Sep 23 2024
Calabasas, CA
Bid Date: Sep 24 2024
Calabasas, CA
Bid Date: Aug 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
