BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2024 at 8:00 PM

Updated September 19, 2024

Site work and paving for a road / highway in Stevens Point, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bids are invited upon the several items and quantities of work approximately shown as follows: Approximately 10,770 square yards of Pulverize and Relay; approximately 7272 square yards of Removing Asphaltic Surface Milling: approximately 1625 tons of 3MT58-28S HMA pavement; approximately 2180 tons of 4MT58-34S HMA pavement; prepare foundation for asphaltic paving (project); traffic control; and all incidental items required to complete the work. The 2024 Fall Paving Project is a Wisconsin Department of Transportation 2024-2025 Local Road Improvement Program (LRIP) Project. The Local Road Improvement Program applies only to the Mill and Overlay portion of the project on Jordan Lane. No bid shall be considered unless accompanied by a bid bond equal to 5 percent (5%) of the total bid price payable to said City of Stevens Point as a guarantee that if the bid is accepted, the bidder will execute and file a contract within ten (10) days after such acceptance. The Board of Public Works reserves the right to reject any or all bids or to waive any informality in the bidding.

Award

Roads / Highways

$497,884.00

Public - City

Paving, Site Work

23

7

2

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
31
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 4, 2024

Project location map

Multiple Locations, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.