BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated February 20, 2025

Site work for a water / sewer project in Stevens Point, Wisconsin. Completed plans call for site work for a water / sewer project.

**As of February 19, 2025, the project was awarded to Staab Construction Corp, with an awarded amount of $617,000.** Site Address: 300 Bliss Ave City: Stevens Point County: Portage County State/Province: WI The upgrade of an existing UV disinfection system: which includes the removal and replacement of three existing UV banks, the removal and replacement of three power distribution centers, the removal of three hydraulic system center and the replace of one hydraulic system center, the concrete modifications of (three) existing channels and the installation of a new transformer, power panel and auxiliary UV equipment. Additionally, the removal and replacement. Additionally, the replacement of existing of scum baffles, V-notch weirs, and troughs at both Final Clarifier No.1 and No 2. The City of Stevens Point, Wisconsin, hereby gives notice that sealed Bids will be received for the WWTP Clarifiers and UV Upgrades. The Work is generally described as follows: Removal of three individual channel mounted UV systems. Including, three UV banks, three power distribution centers, and three hydraulic system centers at Structure 140. Prepare existing channel walls to conform with the new depth and dimensions of the UV Banks as noted in the drawing set. Install a new Owner Furnished 480 volt power panel and transformer serving the UV System. Install new Owner Furnished UV Disinfection equipment. Remove and replace the scum baffles, v-notch weirs and troughs at Final Clarifier No.1 and No. 2 at Structure 130. Remove and replace three motor operated gates Dates for Substantial Completion and Final Payment A. Milestones 1 and 2 designated in Section 01 11 00 shall be completed by April 18th, 2025 B. The Work will be substantially completed on or before May 30th , 2025, and completed and ready for final payment in accordance with Article 15 of the General Conditions on or before June 30th 2025 Question Deadline 01/15/2025 Questions regarding the bid documents should be directed to Donohue & Associates attention: Eric Lynne, PE (Telephone 952-920-1811 email elynne@donohue-associates.com).

Award

Water / Sewer

$617,000.00

Public - City

Site Work

96

56

5

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
31
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

February 21, 2025

Project location map

300 Bliss Ave, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.