Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 8, 2026 at 7:00 PM
Updated January 9, 2026
Demolition, site work, renovation and addition to an educational facility in Stevens Point, Wisconsin. Design plans call for the addition of a 20,000-square-foot educational facility; for the renovation of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
The Collins Classroom Center will now be called Sentry Hall. 20,000 sqft will be added to the building and the existing structure will be renovated. This will include the building of a sustainable facility and improvements to the HVAC system, the courtyard, entrance points, parking lots, and exterior. As of January 8, 2026, a design firm has been selected. Construction is expected to begin in the summer of 2026.
Design
Educational
$98,100,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
1801 4th Ave, Stevens Point, WI
Related To This Project
Stevens Point, WI
--
Stevens Point, WI
Bid Date: Jan 22 2025
Stevens Point, WI
Bid Date: Feb 18 2025
Stevens Point, WI
Bid Date: Mar 26 2019
Stevens Point, WI
Bid Date: Feb 25 2025
Stevens Point, WI
Bid Date: Feb 18 2025
Stevens Point, WI
Bid Date: Mar 04 2025
Stevens Point, WI
Bid Date: Mar 04 2025
Stevens Point, WI
Bid Date: Nov 12 2024
Stevens Point, WI
Bid Date: Oct 02 2024
Stevens Point, WI
Bid Date: Oct 01 2024
Stevens Point, WI
Bid Date: Sep 04 2024
Stevens Point, WI
Bid Date: Aug 21 2024
Stevens Point, WI
Bid Date: Aug 15 2024
Stevens Point, WI
Bid Date: Aug 06 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
