Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 30, 2024 at 8:00 PM
Updated October 31, 2024
Site work and paving for a mixed-use development in Mount Vernon, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of September 6, 2024, this project has not yet been awarded. The project is expected to be awarded on September 16, 2024. City/County: Mt Vernon This project consists of the reconstruction of Fountain Place Drive, including HMA milling and resurfacing, PCC pavement reconstruction on a lime-soil stabilized subbase, combination curb and gutter, storm sewer, paved ditch, driveway pavement, and other incidental work. Project Location: Fountain Place Drive in Mt. Vernon Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Reconstruction of Fountain Place Drive, Including HMA Milling and Resurfacing, PCC Pavement Reconstruction LOCATION OF WORK: The location of the work is on Fountain Place Drive (MUN 4400) from the intersection of South 10th Street and Fountain Place Drive to a location 150 ft past the current east termination of Fountain Place Drive.
Award
Roads / Highways
$1,451,734.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2024
October 4, 2024
Fountain Pl Dr, Mount Vernon, IL
Related To This Project
Mount Vernon, IL
Bid Date: Oct 08 2024
Mount Vernon, IL
Bid Date: Nov 12 2024
Mount Vernon, IL
Bid Date: Dec 10 2024
Mount Vernon, IL
Bid Date: Dec 13 2024
Mount Vernon, IL
Bid Date: Dec 17 2024
Mount Vernon, IL
Bid Date: Jan 17 2025
Mount Vernon, IL
Bid Date: Jan 17 2025
Mount Vernon, IL
Bid Date: Jan 10 2025
Mount Vernon, IL
Bid Date: Nov 13 2024
Mount Vernon, IL
Bid Date: Aug 23 2024
Mount Vernon, IL
Bid Date: Jul 31 2024
Mount Vernon, IL
Bid Date: Jul 31 2024
Mount Vernon, IL
Bid Date: Aug 02 2024
Mount Vernon, IL
Bid Date: Jul 02 2024
Mount Vernon, IL
Bid Date: Nov 24 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
