Site work and paving for a sidewalk / parking lot in Mount Vernon, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Project consists of 4,487 sf of new 6" thick reinforced concrete pavement. The City Reserves the right to reject any and/or all bids, and may accept that which is most advantageous to the City of Mt. Vernon. TECHNICAL SPECIFICATIONS Scope of the project will include the following: 1. Remove all necessary existing concrete, asphalt, & aggregate materials to complete project as shown on plans. The proposed pavement section shall be 6" thick so at the most, 6" of material will need to be removed. The cost for this removal shall be incidental to the cost of the project. A City dump site will be provided for clean concrete only, not excess soil & rock. 2. Removal - Concrete, asphalt, & or rock - This quantity is shown on the bid schedule. Note that the extent of various materials required to be removed is unknown. It is required however to remove all materials necessary in order to install the 6" thickness of Proposed Concrete Alley. If the base grade after removal is down to bare dirt, then an additional amount of removal will be required in order to install some "Rock Compacted Subbase" at a min. of 4" thick. 3. The existing asphalt along the "Rare Restaurant" building shall be saw-cut prior to removal so as to minimize damage/disturbance along this building. Contractor shall repair/replace any damaged pavement surfaces. This repair cost shall be incidental to the cost of the project. 4. Class PV concrete w/ fiber shall be used. Pavement construction shall be completed in accordance with IDOT standard specifications. See IDOT specifications Section 420 & 1020. Concrete shall achieve a minimum compressive strength of 3500 psi in 3 days. The proposed concrete alley shall be 6" thick and reinforced with 12.5' x 8' - 8ga welded wire fabric sheets. Saw-cuts shall be performed as per IDOT Standards. 5. Expansion Joints - Expansion joints shall be 1/2 " thick and consist of preformed joint filler. Expansion Material Costs are incidental to the project. An expansion joint shall be installed at the west and east end of the project adjacent to the sidewalk. The new concrete abutting this sidewalk shall be pinned w/ smooth dowels to allow for expansion at the expansion joint. 6. The contractor shall be responsible for his own construction staking. The plans show dimensions to assist with the horizontal layout however the vertical profile shall be determined in the field at time of construction by the contractor & public works. Drain flow arrows are shown on the plans which indicate the general idea for grade/drainage. Existing spot elevations are also shown to assist w/ layout. 7. Traffic control shall be the sole responsibility of the contractor. Questions concerning the Contract Documents should be addressed to Matt Fauss, Public Works Director, at City of Mt. Vernon, Mt. Vernon, IL 62864. For further information contact Matt Fauss, Public Works Director, Public Works Department, 1201 Casey 62864, telephone: (618) 242-6853, Avenue, Mt. Vernon, Illinois 62864, Email: matt.fauss@mtvernon.com
Award
Sidewalks / Parking Lot
$49,357.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2024
November 7, 2024
Broadway St, Mount Vernon, IL
Related To This Project
Mount Vernon, IL
Bid Date: Nov 12 2024
Mount Vernon, IL
Bid Date: Sep 04 2024
Mount Vernon, IL
Bid Date: Nov 13 2024
Mount Vernon, IL
Bid Date: Aug 23 2024
Mount Vernon, IL
Bid Date: Jul 31 2024
Mount Vernon, IL
Bid Date: Jul 31 2024
Mount Vernon, IL
Bid Date: Aug 02 2024
Mount Vernon, IL
Bid Date: Jul 02 2024
Mount Vernon, IL
Bid Date: Nov 24 2020
Mount Vernon, IL
Bid Date: Jun 11 2024
Mount Vernon, IL
Bid Date: Jun 11 2024
Mount Vernon, IL
Bid Date: Jun 18 2024
Mount Vernon, IL
Bid Date: Jun 10 2024
Mount Vernon, IL
Bid Date: Jun 05 2024
Mount Vernon, IL
Bid Date: Jun 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.