BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 12, 2025

Site work and paving for a road / highway in Mount Vernon, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This work consists of coordinating, furnishing, installing, maintaining, monitoring, relocating, covering, uncovering, and removing all traffic control devices and detour signs in accordance with the plans. Reconstruction of the I-57/I-64 interchange and intersection modifications at various locations in Mt. Vernon. Region 5 District 9 Federal Project # VBP% 0.00 County(s) Jefferson Key Route(s) FAI 57, FAI 64 Marked Route(s) I-57/I-64 Section(s) 13,13-2(N-1,TS-1);(41-3)HB2 State Job #(s) C-99-051-15 PPS #(s) 9-00686-0500 Contract Specifics Project Labor Agreement Completion Date: November 23, 2027 Questions not accepted as of January 07, 2025 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 27, 2024. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 127 - Reconstruction of the I-57/I-64 Interchange and Intersection Modifications

Award

Roads / Highways

$38,661,329.00

Public - State/Provincial

Paving, Site Work

793

13

21

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
74
Bidding Soon
994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

March 18, 2025

Project location map

Multiple Locations, Mount Vernon, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.