BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Fairfax, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Location and Description Installation of a new soldier pile retaining wall and road paving work at and around Tamalpais and Berry Road. Work will include new wall, guardrail, and other improvements. Estimated Cost The estimated construction cost is $380,000 License This Project requires a valid California contractor's license for the following classification(s): Class A - General Engineering. DIR Registration Town may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations ("DIR") to perform public work pursuant to Labor Code 1725.5, subject to limited legal exceptions. Prevailing Wage Requirements General. Pursuant to California Labor Code 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Rates The prevailing rates are on file with the Town and are available online through the Department of Industrial Relations. Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. Questions Bid questions must be in writing and can be emailed to Loren Umbertis at Lumbertis@townoffairfax.org. Bids shall be valid for a period of 90 calendar days after the Bid opening date. Scope of work shall include construction of a new soldier pile and Wood or Concrete lagging retaining wall. The new retaining wall will be constructed on the slope between the intersection of Berry Trail and Tamalpais Road and the water supply pump station below.The work will include removal of damaged wall debris and repair of roadway along edge of wall. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the Town, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to TownTown of Fairfax as bid security. The bid security shall be provided as a guarantee that within ten (10) working days after the Town provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with Town. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this Project, it shall be the Bidder's sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its Bid. Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its Bid and for the duration of the contract: A Substitution requests shall be made within 35 calendar days after the award of the contract. Pursuant to Public Contract Code Section 3400(b), the Town may make findings designating that certain additional materials, methods or services by specific brand or trade name other than those listed in the Standard Specifications be used for the Project. Such findings, if any, as well as the materials, methods or services and their specific brand or trade names that must be used for the Project may be found in the Special Conditions Pursuant to Public Contract Code section 7201, the Town has made a determination that the project described herein is substantially complex, and therefore a retention of 10% will be withheld from payment until after the work is complete. Town shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the Town from the Base Bid. Town reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. For further information, contact Loren Umbertis, Public Works Director at lumbertis@townoffairfax.org or 415-342-7114

Bid Results

Roads / Highways

$252,836.00

Public - City

Paving, Site Work

10

8

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
169
Bidding Soon
3,098
All Active Projects
1,218
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 3, 2024

October 3, 2024

November 17, 2024

img_map_placeholder

Tamalpais Rd & Berry Trail, Fairfax, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.