Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Joliet, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; for outdoor lighting for a road / highway; and water / sewer project.
The proposed project scope of work consists of the reconstruction of the following Larkin Avenue ramps to and from I-80: EB I-80 exit ramp to Larkin Avenue, NB Larkin Avenue entrance ramp to EB I-80, WB I-80 exit ramp to Larkin Avenue and SB Larkin entrance ramp to WB I-80. The work also includes reconstruction of the northwest and southeast shoulder approaches to the Larkin Avenue Bridge over I-80 as well as construction of a proposed retaining wall along the EB exit ramp and noise walls. Related work proposed in this contract includes grading, pavement markings, signage, erosion control, landscaping, drainage improvements, lighting and traffic signal. Gross length and net length are 4,049 ft (0.767 mi.). Region 1 District 1 Federal Project # N/A County(s) Will Key Route(s) FAI 80 Marked Route(s) I-80 Section(s) FAI 80 21 Structure 4 State Job #(s) C-91-112-22 PPS #(s) 1-77247-6400 Contract Specifics Completion Date: November 07, 2025 Plus 10 Working Days Questions not accepted as of September 10, 2024 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, August 30, 2024. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 003 - Grading, Pavement Markings, Signage, Erosion Control, Landscaping, Drainage Improvements, Lighting and Traffic Signal, Reconstruction of the Following Larkin Avenue Ramps The work consists of the reconstruction of the following Larkin Avenue ramps to I-80: Eastbound I-80 exit ramp to Larkin Avenue, Northbound Larkin Avenue entrance ramp to Eastbound I-80, Westbound I-80 exit ramp to Larkin Avenue and Southbound Larkin entrance ramp to Westbound I-80. The work also includes reconstruction of the northwest and southeast shoulder approaches to the Larkin Avenue Bridge over I-80. The work also includes the construction of a proposed retaining wall along the Eastbound exit ramp (SN 099-Z043). The work also includes construction of noise walls.
Bid Results
Roads / Highways
$22,132,931.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 20, 2024
November 19, 2024
N Larkin Ave, Joliet, IL
Related To This Project
Joliet, IL
Bid Date: Sep 19 2024
Joliet, IL
Bid Date: Oct 03 2024
Joliet, IL
Bid Date: Sep 19 2024
Joliet, IL
Bid Date: Oct 02 2024
Joliet, IL
--
Joliet, IL
--
Joliet, IL
Bid Date: Oct 10 2024
Joliet, IL
Bid Date: Sep 20 2024
Joliet, IL
Bid Date: Aug 20 2024
Joliet, IL
Bid Date: Aug 25 2021
Joliet, IL
--
Joliet, IL
Bid Date: Aug 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.