EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a multi-residential development in Mattoon, Illinois. Completed plans call for the renovation of a multi-residential development.

Project Description : The project requirements are to remove and replace all Trash Chute doors & frames, and remove & replace the Trash Compactor at the Park Tower apartment building (while always limiting operation downtime to a minimum), located in Mattoon, IL. (109 Prairie Street). Not less than the prevailing hourly wage as specified in the Project Manual shall be paid for any part of the work. Bidders shall not discriminate against any employee or applicant for employment because of race, color, creed, or national origin. With each bid an amount equal to five percent (5%) shall be submitted in the form of a certified check or bank draft payable to the Housing Authority of the County of Coles; U.S. Government Bonds: or satisfactory Bid Bond executed by the bidder as principal and having a surety thereon a surety company acceptable to the Housing Authority of the County of Coles. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds. Attention is called to the provisions for equal employment opportunity; non-discriminatory policies; and payment of not less than the minimum salaries and wages, as set forth in the Specifications, must be paid on this project. The Housing Authority of the County of Coles reserves the right to reject non-reasonable or non-responsive bids or to waive any informalities in the bidding. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Housing Authority of the County of Coles. GOALS: The MBE/FBE/DBE goal for this General Construction Contract is ( 20 ) percent of the amount of the contract awarded by HACC.

Award

Multi-Residential

$57,798.00

Public - County

Renovation

7

17

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Flooring, Fluid-Applied Flooring, Resinous Flooring, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment, Solid Waste Handling Equipment, Waste Compactors and Destructors
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
47
Bidding Soon
424
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

October 31, 2024

img_map_placeholder

109 Prairie Ave, Mattoon, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Trash Chute Renovations at Park Tower Apartment Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.