BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work and paving for a mixed-use development in Anchorage, Alaska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project Consists of but is not limited to: • Resurfacing Forest Park Drive between W. Northern Lights Boulevard and Hillcrest Drive. • Partial replacement of associated sidewalk, curb and gutter, signing, striping, and ADA curb ramps. • Installation of Neighborhood Greenway enhancements including additional signage, traffic markings, and speed humps. • Furnishing all labor, materials, equipment, supervision, and other facilities necessary to successfully complete the Work set forth in the Drawings and Specifications. Estimated Construction Cost: Between: $1,000,001 - $3,000,000 Questions Due: 12:00 P.M. Local Time, April 17, 2025 All Questions Shall Be Submitted Prior to the Question Due Date This Will Be the Final Opportunity to Ask Questions or Request Clarifications. Questions and requests for interpretation or clarification of the bidding Documents shall be made in writing to the Purchasing Office (wwpur@muni.org). Please reference the Invitation to Bid Number & Project Title. Do not contact the specified department directly. The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding sixty (60) days from the time of the opening. This Project shall be Substantially Completed within sixty (60) calendar days after the Notice-to-Proceed is issued or prior to August 9, 2025, whichever occurs first. The Contract Completion date shall be within fifteen (15) calendar days after the Substantial Completion letter is issued. The total contract days for this Project is seventy-five (75). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$847,407.00

Public - City

Paving, Site Work

35

7

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

August 9, 2025

Project location map

Forest Park Dr, Anchorage, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.