BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in West Newbury, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Town of West Newbury, Massachusetts, Acting Through West New-Bury's Chief Procurement Officer, Will Accept Sealed Bids From Qualified Contractors for the Replacement of Bridge No. N-11-007 = W-20-001 Car- Rying Plummer Spring Road/middle Street Over Artichoke Reservoir, in the City of Newburyport/town of West Newbury, Massachusetts. Question Deadline 09/23/2024 at 4:00 PM ET Questions Must Be in Writing by E-mail Only and Received No Later Than. Questions Must Be in Writing by E-mail Only and Received No Later Than. All pre-bid questions concerning the contract documents and the work contained therein should be emailed to Procurement@wnewbury.org Online Prequalification of Contractors With the Class of Work as, (Bridge - Construction), for the Project With an Estimated Value of $3,605,000 Will Be Required. All Bids for This Project Are Subject to the Applicable Bidding Laws of Massachusetts, Including M.g.l. C. 30, 39m as Amended. Attention is Directed to the Minimum Wage Rates to Be Paid as Determined by the Commissioner of Labor and Workforce Development and the Weekly Payroll Record Submittal Requirements Under the Provisions of M.g.l. C. 149, 26-27d. The Town Reserves the Right to Waive Any Informalities, to Accept or Reject, In Whole or in Part Any or All Bids, or Take Whatever Other Action May Be Deemed to Be in the Best Interest of the Town. The scope of work for the bridge replacement includes but is not limited to, the following: installation of erosion and sediment control, control of water, demolition of the existing bridge and substructure, placement of riprap scour protection covered with 12 inches of natural streambed material and the installation of the bridge. The proposed bridge is comprised of superpave on a reinforced concrete deck with spread box beams supported by reinforced concrete integral abutments with steel piles, bridge rail, and other incidental work necessary to complete the proposed project.

Award

Bridges / Tunnels

$2,971,591.00

Public - City

Demolition, New Construction, Paving, Site Work

72

27

6

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
163
Bidding Soon
2,310
All Active Projects
1,082
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

December 2, 2024

img_map_placeholder

Plummer Spring Rd & Middle St, West Newbury, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.