Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Hollister, California. Completed plans call for site work for a playground / park / athletic field.
The fence is intended for the use and benefit of the property owners within Sunnyside Estates and the public. The fence is to be constructed on County property and paid for by public funds (see Location Map). Therefore, public bidding requirements and prevailing wage requirements must be followed. The project is funded with Park Impact Fees. The fence construction will span 1,400 linear feet (lf) connecting the Sunnyside Estates Development, providing privacy, security and decreasing property damage to the proposed park. The fence will restrict access to vehicles and pedestrians from using it as a passageway. Request for Clarification: August 27, 2024, 11:00am\ please submit a question at County's eProcurement Portal explaining what information is confidential and asking how it should be submitted. the Contractor shall possess a current and valid Type (A) General Engineering Contractor License or Type (B) General Building Contractor License. The cost estimate is approximately $80,000 to $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. bid bond required. 100% performance bond and 100% payment bonds required from successful bidder. The County reserves the right to accept or reject any or all bids, and to accept or reject any item, to withdraw a line item or entire Bid, The fence construction will span 1,400 linear feet (lf) connecting the Sunnyside Estates Development, providing privacy, security and decreasing property damage to the proposed park. The fence will restrict access to vehicles and pedestrians from using it as a passageway. The fence will be constructed 6' high, board on board style. Request for Clarification August 27, 2024, 11:00am
Post-Bid
Playgrounds / Parks / Athletic Fields
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 6, 2024
October 7, 2024
To Be Determined, Hollister, CA
Related To This Project
Hollister, CA
Bid Date: Nov 14 2024
Hollister, CA
Bid Date: Nov 19 2024
Hollister, CA
Bid Date: Dec 05 2024
Hollister, CA
Bid Date: Dec 12 2024
Hollister, CA
Bid Date: Dec 18 2024
Hollister, CA
--
Hollister, CA
Bid Date: Dec 19 2024
Hollister, CA
Bid Date: Aug 28 2024
Hollister, CA
Bid Date: Aug 06 2024
Hollister, CA
--
Hollister, CA
--
Hollister, CA
--
Hollister, CA
--
Hollister, CA
Bid Date: Jun 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.