BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2024 at 8:00 PM

Updated October 4, 2024

Site work and paving for a mixed-use development in Twin Falls, Idaho. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Owner is planning to construct the following work for which CM Services are required. The work will be executed in phases as determined during programming and design: Canyon Trail Junction Development - The City of Twin Falls is proposing to construct a waterwise trail head located on the Canyon Rim Trail. The existing site is approximately 3 acres, with 2 acres of undeveloped land and another acre of existing asphalt parking lot, gravel driveway and compacted gravel fire lane. The project includes the construction of a new approach and expanded parking lot, the installation of a prefabricated restroom with a concrete pad and ADA accessible approach, gravel and concrete pathways, paver patio, artificial turf, landscaping, drip irrigation and site amenities including shade structures, benches, and outdoor exercise features. All questions regarding this RFQ must be directed to Chance Munns, 136 Maxwell Ave, Twin Falls, Idaho 83301, Phone (208) 736-2265, Email: cmunns@tfid.org . The Owner may elect to forward some questions to their architect, Stack Rock Group, but all questions must be submitted in writing in email format by August 23, 2024 and directed to Chance Munns. Submitting firms are NOT to contact the project architect, other City employees, or elected officials.

Pre-Construction/Negotiated

Sidewalks / Parking Lot

$100,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
67
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

December 30, 2024

Project location map

Multiple Locations, Twin Falls, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.