Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 8, 2024 at 8:00 PM
Updated October 9, 2024
Renovation of a bridge / tunnel in Hugo, Colorado. Completed plans call for the renovation of a bridge / tunnel.
11.5% DBE Participation Rehabilitation of off-system bridge structure number LIN-32-2W.0A, which carries County Road 32 over the Big Sandy Creek. The bridge deck is significantly deteriorated, containing rust and complete section loss in some portions of the deck. The rehabilitation will consist of a deck replacement, upgrading the bridge rails and guardrail to current MASH standards, and address drainage issues. A shoo-fly beside the bridge will be utilized to carry traffic around the bridge while work is being completed. The major components of the project include the following items Construction of a temporary shoofly detour Removal of existing deck and portions of structure Installation of new superstructure, bridge rail, and guardrail If any Contractor contemplating submitting a Response under this Solicitation is in doubt as to the true meaning of the specifications, the Contractor must submit a written request for clarification to Jacob Piper (lcadmin@lincolncountyco.us) by 4:00 PM on September 5, 2024. All responses will be provided back by September 9, 2024. The contract goal for participation in this Contract by certified Disadvantaged Business Enterprises (DBEs) who have been determined to be underutilized is: 11.5 percent, as further detailed in the Project Specifications. Contractors shall not include federal, state, or local excise or sales taxes in prices offered, as the County is exempt from payment of such taxes. The County tax identification numbers will be made available to the selected contractor
Award
Bridges / Tunnels
$3,213,556.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2024
November 11, 2024
To Be Determined, Hugo, CO
Related To This Project
Hugo, CO
Bid Date: Apr 07 2025
Hugo, CO
Bid Date: Dec 17 2025
Hugo, CO
Bid Date: Jul 10 2025
Hugo, CO
Bid Date: Aug 28 2025
Hugo, CO
Bid Date: Aug 27 2025
Hugo, CO
Bid Date: Mar 16 2026
Hugo, CO
Bid Date: Aug 05 2024
Hugo, CO
Bid Date: Mar 20 2024
Hugo, CO
--
Hugo, CO
Bid Date: Feb 08 2024
Hugo, CO
Bid Date: May 12 2022
Hugo, CO
Bid Date: Dec 01 2022
Aurora, CO
Bid Date: Sep 04 2024
Thornton, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
