BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Pomona, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work to Be Done Consists of Furnishing All Materials, Equipment , Tools, Labor and Incidentals as Required in the Specifications and Contract Documents , for the Following Project(S) : Holt Avenue (West & East) Reconstruction Questions Due Date September 24, 2024 Before 3:00 P.m. Incorporated in 1888, Pomona is One of the Largest Cities in Los Angeles County, Encompassing 22.8 Square Miles , Between the Inland Empire and the San Gabriel Valley, and Approximately 30 Miles East of the Los Angeles Civic Center. Pomona Has a Population of Approximately 169,000. Pomona is a Charter City Administered Under the Council-city Manager Form of Local Government. The City Currently Employs Approximately 530 Full-time Employees , as Well as Approximately an Additional 160 Part-time Employees. Pomona is a Full-service City With the Exception of Fire Services, Which is Currently Contracted Through the County of Los Angeles. City Officials and Staff Take Great Pride in Protecting the Environment , and Providing Quality Drinking Water for Residents and Businesses of Pomona . The City Existing Water and Wastewater Systems Cover an Area of Approximately 22 Square Miles. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% If You Fail to Register With online Prior to Submitting a Response, the City Reserves the Right to Immediately Reject the Response You Submit in Reference to This Solicitation. All Work to Be Done Under This Subsequent Contract Shall Be Completed Within 80 Working Days for All the Base Bid Work; and, 140 Working Days for All the Additive Alternate Work (if Awarded); and, Beginning on the Date Stipulated in the Written "Notice to Proceed" Issued by the City Engineer; and, if Only a Portion of the Additive Alternate Work is Awarded the Allowed Additive Alternate Working Days Will Be Prorated Based on the Dollar Amount) Beginning on the Date Stipulated in the Written "Notice to Proceed" Issued by the City Engineer. The City Reserves the Right to Change the Schedule of Events Without Prior Notice or Responsibility to Propose . It is the Proposer S Sole Responsibility to Check the City S Website on a Consistent Basis for Changes.

Award

Roads / Highways

$12,310,920.00

Public - City

Paving, Site Work

177

10

10

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
90
Bidding Soon
2,248
All Active Projects
918
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

December 9, 2024

img_map_placeholder

W Holt Ave, Pomona, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.