Renovation of a library in Lawrence, New York. Completed plans call for the renovation of a library.

Budget: $50,000 New BMS controls, replacing the existing water-cooled chiller, cooling tower, pumps and piping with a new air-cooled condensing unit and replacing the chilled water coil within the existing air handling unit. Project Start Date: November 1, 2024 Project Completion: May 25, 2025 Pre-Bid Walk Through Date(s): None Bid Location: Bently Meeting Room 280 Central Avenue Lawrence, NY 11559 The Contract will be awarded to the lowest responsible bidder or the proposals will be rejected within 45 days of the date of opening proposals. Bids shall be subject, however, to the discretionary right reserved by the Library to waive any informalities, accept or reject any alternatives, reject any proposals and to advertise for new proposals, if in its opinion the best interest of the Library will thereby be promoted. Each bidder may not withdraw his bid within 45 days after the formal opening thereof. A bidder may withdraw his bid only in writing and prior to the bid opening date. Each bid must be accompanied by bid security of not less than five percent (5%) of the amount of the bid (including base bids and alternates), which may be a certified check, cashier's check, bank draft, or bid bond executed by a Surety Company authorized to do business in the State of New York and made payable to the Owner. In accordance with Part I, Section 106-b, General Municipal Law, the Contractor shall periodically, in accordance with the terms of the Contract, submit to the Architect a requisition for a progress payment for the Work performed and/or materials furnished to the date of the requisition less any amount previously paid to the Contractor. The Owner shall, in accordance with the terms of the Contract, approve and promptly pay the requisition for the progress payment less an amount necessary to satisfy any claims, liens, or judgements against the Contractor which have not been suitably discharged and less any retained amount as hereafter described. The Owner shall not retain in excess of five percent (5%) but not more than ten percent (10%) of each progress payment to the Contractor provided that there are no requirements by the Owner for the Contractor to provide a Performance Bond and Labor and Material Bond in the full amount of the Contract. The Owner shall pay, upon requisition from the Contractor, for materials pertinent to the Project which have been delivered to the site or off-site by the Contractor and/or subcontractor and suitably stored and secured as required by the Owner and the Contractor, provided the Owner may limit such payment to materials in short and/or critical supply and materials specially fabricated for the Project each as defined in the Contract. When the Work or major portions thereof as contemplated by the terms of the Contract are Substantially Complete, the Contractor shall submit to the Architect a requisition for payment of the remaining amount of the Contract balance. Upon receipt of such requisition, the Owner shall approve and promptly pay the remaining amount of the Contract balance less two (2) times the values of any remaining items to be completed and an amount necessary to satisfy any claims, liens, or judgements against the Contractor which have not been suitably discharged.

Sub-Bidding

Library

$50,000.00

Public - City

Renovation

11

13

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
829
Active Projects
473
Bidding Soon
6,592
All Active Projects
2,664
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 8, 2024

November 1, 2024

May 25, 2025

img_map_placeholder

280 Central Ave, Lawrence, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.