Site work for a civil project in Cedar Rapids, Iowa. Completed plans call for site work for a water / sewer project.

The Work generally consists of installation of sludge pipe from both Decant Tanks to the Solids Handling Complex, installation of Odor Control Fan and Duct originating from both Decant Tanks to the Incinerator Building, and installation of drain pipe around the Incinerator building. The Engineer s opinion of probable construction cost for the Work is $1,700,000.00. Bids shall be on a lump sum basis. Contract Time Information Anticipated Start Date: November 18, 2024 Milestones: Substantial Completion - August 31, 2025 Final Completion: September 30, 2025 Question Deadline 10/02/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, either through mail or email. Mailed or emailed questions shall be directed to the following: Jason Kenyon, PE Black & Veatch Corporation 500 E Court Ave, Ste 120 Des Moines, IA 50309 913-458-1834 KenyonJ@bv.com Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda posted to the Ionwave bidding website with notices sent to all parties recorded by Ionwave as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Water / Sewer

$1,780,000.00

Public - City

Site Work

53

26

4

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Lighting, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Structural Aluminum Framing, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Plastering, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Identification for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
24
Bidding Soon
482
All Active Projects
161
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

November 18, 2024

img_map_placeholder

7525 Bertram Rd SE, Cedar Rapids, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.