EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 30, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Montrose, Pennsylvania. Completed plans call for site work for a water / sewer project.

Magnesium Hydroxide Tank Replacement Project. Question Deadline 09/24/2024 at 3:00 PM ET Deadline to submit Questions online. The project consists of the installation of a new chemical mixing tank, chemical mixing unit, air compressor, installation of a masonry block knee wall, dosing pumps and all associated piping and appurtenances necessary to bring the new equipment online. The Work shall be substantially completed within 45 days from Notice to Proceed and Project Closeout must occur by December 12, 2024. Each bid shall be accompanied by a certified or cashier's check or Bid Bond in the amount of 10% of the total bid price, payable to Montrose Municipal Authority, as a guarantee that the Bidder, if its Bid is accepted, shall promptly obtain the required Bonds and insurance and shall prepare the required submittal documents and execute the Agreement. Montrose Municipal Authority reserves the right after opening Bids to reject any or all Bids, or waive any informality or to award any portion of the project. The Pennsylvania State Prevailing Wage Rates will apply to this project Description of Work 1. Provide all labor, material and equipment to furnish and install a complete Magnesium Hydroxide Feed Pump System to provide the required feeding to the application points. The equipment shall be essentially automatic in operation but capable of manual operation as required for maintenance or test purposes. 2. All piping, manual shut off valves and mounting hardware (e.g. nuts, bolts, washers, pipe stands, or cinch anchors) associated with connecting or mounting the metering pumps as herein specified, shall be stainless steel and shall be provided and connected under this Section or as specified by the manufacturer. 3. The feed pump system shall be designed to dedicate one feed pump to operate, with the other pump ready to operate on failure of the dedicated pump. The feed pumps shall be automatic and controlled by a new PLC.

Post-Bid

Water / Sewer

$400,000.00

Public - County

Site Work

6

15

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Work Sequence, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Accessories, Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Cold-Formed Metal Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
76
Bidding Soon
986
All Active Projects
391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

November 6, 2024

img_map_placeholder

237 Ritztex Rd, Montrose, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Montrose Waste Water Treatment Plant Magnesium Hydroxide Tank Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.