BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Allegan, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This work consists of the determined low Bidder, or the subcontractor(s) indicated in the pass-through warranty obligation folder in the electronic bid file, providing a warranty performance bond for the warranty(ies) listed herein. Below is(are) the warranty(ies) required in this contract along with the locations where the warranty applies, and a listing of the pay items and estimated quantities associated with that warranty type. 6.78 mi of hot mix asphalt pavement repairs with single course chip and fog seal on M-89 from 29th Street easterly to the Kalamazoo River, Allegan County. This project includes a 2 year pavement performance single chip seal warranty. Net classification required for this project is 1445 Ca or 1445 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ca and Cb. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No NH 03023 216529A 24A0912 MIDOT - 2410 026 - Hot Mix Asphalt Pavement Repairs With Single Course Chip and Fog Seal on M-89

Award

Roads / Highways

$1,300,351.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
51
Bidding Soon
679
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

June 16, 2025

img_map_placeholder

M-89, Allegan, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.