Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a civil project in Winnipeg, Manitoba. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Phase I The Work Involves Transportation of All Material and Equipment Required for the Construction of the Acrow Bridge and Related Roadworks via the Winter Road to the Project Site. Phase Ii The Work Involves Excavation, Replacement of Unsuitable Material and Backfill for Foundation Construction, Construction of Cast-in-place Concrete Foundations, Assembly and Launching of Permanent Acrow Bridge, Installation of Timber Deck, Guardrails and Precast Concrete Approach Barriers, and Related Roadworks to Open the River Crossing Over Lawford River. Phase Iii Return of the Acrow Bridge Launching Components to Manitoba Transportation and Infrastructure Stony Mountain Bridge Yard and Demobilization From the Site. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Sub Completion 1 All Work for Phase 1 as Detailed Under the Description of Work Shall Be Completed by No Later Than March 20, 2025. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. Sub Completion 2 All Work for Phase 2 as Detailed Under the Description of Work Shall Be Completed by No Later Than December 31, 2025. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. Completion All Work as Detailed Under the Description of Work Shall Be Completed by No Later Than March 20, 2026. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. In Addition to the Daily Liquidated Damages, a Lump Sum Liquidated Damage of Twenty Five Thousand ($25.000.00) Dollars Will Be Charged to the Contractor if the Work Associated With Interim Completion Date Ii is Not Completed by December 31, 2025. In Addition the Lump Sum Liquidated Damages Will Be Charged to the Contractor on a Recurrent Annual Basis Until Substantial Completion. Seasonal Shutdown Date the Seasonal Shutdown for Roadwork is October 15 of Any Given Year. The Seasonal Shutdown for in-stream Work is April 1-june 30 of Any Given Year. Question Acceptance Deadline: 2024/10/10 12:00:00 PM CDT All enquiries regarding the Work may be made to: Adam Brown P. Eng. Junior Structures Engineer 600-215 Garry Street 431-279-1546 Adam.Brown@gov.mb.ca Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Bid Results
Bridges / Tunnels
$4,670,862.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2024
December 16, 2024
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Oct 08 2024
Winnipeg, MB
Bid Date: Oct 10 2024
Winnipeg, MB
Bid Date: Oct 07 2024
Winnipeg, MB
Bid Date: Oct 02 2024
Winnipeg, MB
Bid Date: Oct 02 2024
Winnipeg, MB
Bid Date: Oct 08 2024
Winnipeg, MB
Bid Date: Oct 11 2024
Winnipeg, MB
Bid Date: Oct 03 2024
Winnipeg, MB
Bid Date: Sep 30 2024
Winnipeg, MB
Bid Date: Oct 01 2024
Winnipeg, MB
Bid Date: Oct 08 2024
Winnipeg, MB
Bid Date: Oct 04 2024
Winnipeg, MB
Bid Date: Oct 31 2024
Winnipeg, MB
Bid Date: Sep 26 2024
Winnipeg, MB
Bid Date: Sep 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.