BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a civil project in Winnipeg, Manitoba. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Phase I The Work Involves Transportation of All Material and Equipment Required for the Construction of the Acrow Bridge and Related Roadworks via the Winter Road to the Project Site. Phase Ii The Work Involves Excavation, Replacement of Unsuitable Material and Backfill for Foundation Construction, Construction of Cast-in-place Concrete Foundations, Assembly and Launching of Permanent Acrow Bridge, Installation of Timber Deck, Guardrails and Precast Concrete Approach Barriers, and Related Roadworks to Open the River Crossing Over Lawford River. Phase Iii Return of the Acrow Bridge Launching Components to Manitoba Transportation and Infrastructure Stony Mountain Bridge Yard and Demobilization From the Site. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Sub Completion 1 All Work for Phase 1 as Detailed Under the Description of Work Shall Be Completed by No Later Than March 20, 2025. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. Sub Completion 2 All Work for Phase 2 as Detailed Under the Description of Work Shall Be Completed by No Later Than December 31, 2025. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. Completion All Work as Detailed Under the Description of Work Shall Be Completed by No Later Than March 20, 2026. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. In Addition to the Daily Liquidated Damages, a Lump Sum Liquidated Damage of Twenty Five Thousand ($25.000.00) Dollars Will Be Charged to the Contractor if the Work Associated With Interim Completion Date Ii is Not Completed by December 31, 2025. In Addition the Lump Sum Liquidated Damages Will Be Charged to the Contractor on a Recurrent Annual Basis Until Substantial Completion. Seasonal Shutdown Date the Seasonal Shutdown for Roadwork is October 15 of Any Given Year. The Seasonal Shutdown for in-stream Work is April 1-june 30 of Any Given Year. Question Acceptance Deadline: 2024/10/04 12:00:00 PM CDT All enquiries regarding the Work may be made to: Adam Brown P. Eng. Junior Structures Engineer 600-215 Garry Street 431-279-1546 Adam.Brown@gov.mb.ca Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

GC Bidding

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

20

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
51
Bidding Soon
535
All Active Projects
230
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 8, 2024

November 11, 2024

March 20, 2026

img_map_placeholder

Multiple Locations, Winnipeg, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.