BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2024 at 8:00 PM

Updated October 31, 2024

Site work for a civil project in Salt Lake City, Utah. Completed plans call for site work for a water / sewer project.

Description Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation Utilities including gas and power and water and sewer and electricity and utilities management and consulting services, and alternative forms of energy, solar panels and servicing The work involves furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The work generally includes but is not limited to, the following: 1. Installing measuring devices at all drainage sites. 2. Installing drainage pipes and manholes. This project will connect our new dam lining system to downstream drains in Parley's Creek, including flow measurement installation areas. On the outside of the envelope, the bidder shall indicate the project number, description of the bid and include the bidders return mailing address. For information concerning this project post questions on U3P Utah Public Procurement Place. Bid Security amount must equal 5 percent of the total amount of the Bid. A PDF of the Bid Security should be included in the bid documents. Bids utilizing cashier's checks or cash equivalent may not be submitted electronically. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract. Engineer's Estimate: $445,555.00 Doc note: It is the responsibility of applicant to periodically check and download additional information that may be posted. Alternatively, specifications and plans may be obtained at the Salt Lake City Public Utilities Office at 1805 West 500 South, Salt Lake City, Utah, 84104. A $50.00 non-refundable fee and one week's notice will be required for each complete hard-copy set. If you have a hard-copy, it is your responsibility to check for updated information and addendums during the bidding period. NON-DISCRIMINATION IN EMPLOYMENT: Bidders on this work will be required to comply with the President's Executive Order No. 11246, and the provisions of Executive Order no. 11375, Section 3 of the Housing and Urban Development Act of 1968 and 24 CRF Part 135 as included therein. The requirements for bidders and contractors under these regulations are explained in the specifications. The right is reserved to reject any or all bids.

Bid Results

Water / Sewer

$404,936.00

Public - City

Site Work

29

16

5

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

November 11, 2024

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.