Site work and paving for a sidewalk / parking lot in Kahoka, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of January 31,2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The proposed work includes: Sidewalk improvements along West Main Street from North Morgan Street heading East approximately 290 LF and turning North along North Johnson Street approximately 310 LF turning West along West Commercial Street approximately 140 LF terminating at the alley midway back to North Morgan Street. The Proposal shall be accompanied by a certified or cashier's check drawn on a solvent Missouri bank or trust company made payable to the City of Kahoka or a Bid Bond issued by a surety licensed to conduct business in the state of Missouri and appearing on the U.S. Treasury Department's most current list (Circular 570, as amended), in the amount of not less than five percent (5%) of the total bid. The Bid Bond may be retained by the City of Kahoka, as a guaranty that if the Proposal is accepted, the bidder will execute the Contract and file an acceptable Performance Bond and Payment Bond within fifteen (15) days after the award of the Contract. The Contractor doing the work must pay for labor at rates not less than those certified pursuant to Section 290.210-.340, RSMo. (1986) by the Missouri Department of Labor and Industrial Relations as indicated by the schedule included in the Contract Documents. In accordance with Section 102.2 of the Missouri Standard Specifications for Highway Construction, a prime contractor must have a fully responsive contractor questionnaire on file with the Missouri Highways and Transportation Commission (MHTC) at least seven (7) days prior to the bid opening date. The limitation in Sec 108.1.1 of the Missouri Standard Specifications for Highway Construction that "the contractor's organization shall perform work amounting to not less than 40 percent of the total contract cost" is waived for this contract. Instead, the less restrictive terms of the Federal Highway Administration's rule at Title 23 Code of Federal Regulations (CFR) 635.116(a) shall apply, so that the contractor must perform project work with its own organization equal to and not less than 30 percent of the total original contract price. All other provisions in Sec 108.1.1 et seq. of the Missouri Standard Specifications for Highway Construction shall remain in full force and effect, and shall continue to govern the contractor and its subcontractors, in accordance with the provisions of Title 23 CFR 635.116. The award of Contracts on this project shall be predicated upon competitive bidding, with award being made to the lowest responsive, responsible bidder. Said lowest Bidders shall be determined for each Contract by summarizing the applicable low base bids. Contractors and sub-contractors who sign a contract to work on public works projects must provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The contract DBE goal for the amount of work to be awarded is 0% of the total federal project price. No 2nd Tier Subcontracting will be allowed on this project. The City of Kahoka reserves the right to reject any and all bids and to waive all informalities in the bids. No bids may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of bids. MODOT - Downtown Sidwalk Project
Bid Results
Sidewalks / Parking Lot
$57,103.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 3, 2025
February 3, 2025
Multiple Locations, Kahoka, MO
Related To This Project
Kahoka, MO
Bid Date: Mar 01 2025
Kahoka, MO
Bid Date: Dec 10 2025
Kahoka, MO
Bid Date: Dec 10 2025
Kahoka, MO
Bid Date: Feb 09 2022
Kahoka, MO
Bid Date: Feb 09 2022
Phase 4 Distribution System Improvements: Contract No.1: 75,000 Gallon Luray Elevated Tank - 4574949
Kahoka, MO
Bid Date: Feb 09 2022
Kahoka, MO
Bid Date: Feb 09 2022
Kahoka, MO
Bid Date: Mar 03 2023
Kahoka, MO
Bid Date: Mar 03 2023
Jefferson City, MO
Bid Date: Oct 17 2024
Saint Louis, MO
--
Macon, MO
Bid Date: Oct 24 2024
Saint Charles, MO
Bid Date: Oct 16 2024
Warrensburg, MO
Bid Date: Sep 27 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.