BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Park Forest, Illinois. Completed plans call for site work for a water / sewer project.

Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Wet Interior: Spot abrasive blast clean coating failures on the access tube and sidewall to a SSPC-SP10 near-white metal standard. Apply a spot two (2) coat epoxy system to the prepared surfaces. The cathodic protection system is to be removed, the broken support arm replaced, and the system reinstalled by the Owner's vendor (or approved equal), coordination and payment is the Contractors responsibility. Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall) and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply two (2) coat epoxy system to the prepared surfaces. Building Piping: Abrasive blast clean to a SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system. Foundation: Water clean and apply a two (2) coat epoxy system. Mixer: Install a mechanical mixer. Repairs: 1) Replace the access tube manway gasket. 2) Install handholds at the roof hatches. 3) Replace the expansion joint. 4) Replace the mud valve. 5) Overflow discharge modification. 6) Replace roof vent with a pressure vacuum vent. 7) Replace the seal at the access tube air gap and install additional alignment lugs. 8) Install a roof handrail with a painter's railing. 9) Relocate the antennas to the roof handrail. 10) Weld a rigging lug on the bowl. 11) Replace light fixture in the dry interior. 12) Replace the dry interior light bulbs. SCOPE of WORK Tank Information: The structure is a 500,000-gallon spheroid elevated water storage tank with a low-water level of 92 ft. located at 98 N. Arbor Trail in Park Forest, Illinois. The work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Wet Interior: Spot abrasive blast clean coating failures on the access tube and sidewall to a SSPC-SP10 near-white metal standard. Apply a spot two (2) coat epoxy system to the prepared surfaces. The cathodic protection system is to be removed, the broken support arm replaced, and the system reinstalled by the Owners vendor (or approved equal), coordination and payment is the Contractors responsibility.

Award

Water / Sewer

$338,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
92
Bidding Soon
1,772
All Active Projects
793
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

April 14, 2025

img_map_placeholder

To Be Determined, Park Forest, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.