BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a transportation facility in Santa Barbara, California. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Scope of Work: Router out and prep 60,000 lineal feet of surface cracks in asphalt taxiways throughout Air Operations Area at the Santa Barbara municipal airport, prep and fill with approved crack seal product to industry standards. Repaint airfield markings damaged by crack seal project to FAA standards. The amount of restriping will be determined by crack seal damage. Project Type Bid Response Types Line Items Subcontractor REFER TO SECTION 1.7 ORIGINAL DOCUMENTS FOR BID SUBMITTAL REQUIREMENTS (required) Type of Award Lump Sum License Requirements A or C-32 Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 10/04/2024 12:00 PM (PDT) The project encompasses the Preparation and crack sealing of 60,000 lineal feet of corrupted asphalt discovered in pavement inspections to comply with FAA standards. Work to be performed at these locations will include furnishing all insurance, bonds, labor, materials, tools, equipment, supervision, and appurtenances necessary to pre-sweep and post-sweep the area as required, remove and re-stripe all paint, and perform other related work as necessary to provide a complete project. All laborers will always be under the supervision of Airport staff due to all work performed will be within the Air Operations Area (AOA) secure area of the airport. All work to be in accordance with the FAA Advisory Circular 150/5340-1M and the AC 150 Marking Plan. In accordance with Civil Code & 9550, if the bid exceeds $25,000, the Successful Bidder shall furnish within ten (10) consecutive calendar days after written Notice of Award, a Payment Bond in an amount equal to one hundred percent (100%) of the total amount of the bid as well as a separate Performance Bond in the amount of 100% of the bid total. engineer's estimate $150,000

Bid Results

Transportation Terminals

$192,500.00

Public - City

Paving, Site Work

3

7

2

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
357
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2024

November 13, 2024

img_map_placeholder

500 James Fowler Rd, Santa Barbara, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.