Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Remodeling of an educational facility in Orondo, Washington. Completed plans call for the remodel of a educational facility.
Orondo School District invites bidders to deliver bids to Orondo School District for remodel of the lower floor of the Orondo School District s Old School House with limited updates to the main floor in order to facilitate a new Early Learning Center. The expected cost of construction is $900,000. No bidder may withdraw his bid after the time set for opening thereof, unless the award is delayed for a period exceeding 40 days. A bid bond or surety check in the amount of 5% of the proposal is required. The Board of Directors of Orondo School District reserves the right to reject any or all bids and to waive as an informality any irregularities . Orondo School District is committed to providing the maximum practicable opportunity for participation by Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Veteran Owned Businesses; however, no minimum level of participation shall be required as a condition of selection. Summary Scope of Work a. Upgrade of 4 exterior entrances doors. b. Revise east stairwell to serve main and lower floor. c. Abate the remaining asbestos containing building materials as demolition progress allows. d. Cut out and re-pour a section of lower floor slab to inset the new wheelchair lift 3" below adjacent finish floor. Additional plumbing cuts as noted. e. Provide ADA access to main and lower floors via a new wheelchair lift. f. Remodel lower floor with four early learning classrooms, restrooms, reception, future kitchen, mechanical room, and egress. g. Relocate electrical service, electrical panels and fan-coil unit. Install new duct-work from fcu to serve some areas and install new mechanical minisplit systems to serve the remaining areas.h. Upgrade lighting to LED both floors. i. Provide electrical raceways for owner-installed life/safety, surveillance and data network low voltage systems. j. Install a new septic pressure system including a lift-station and dosing tank.
Bid Results
Educational
$1,063,500.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2024
November 29, 2024
100 Orondo School Rd, Orondo, WA
Related To This Project
Orondo, WA
--
Orondo, WA
Bid Date: Aug 14 2024
Orondo, WA
Bid Date: Jul 17 2023
Orondo, WA
Bid Date: Jun 29 2022
Orondo, WA
--
Orondo, WA
--
Snohomish, WA
--
Bellingham, WA
--
Newcastle, WA
Bid Date: Oct 23 2024
Bellingham, WA
Bid Date: Oct 23 2024
Winlock, WA
Bid Date: Nov 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.