Renovation of a pre-engineered storage facility in Grambling, Louisiana. Completed plans call for the renovation of a pre-engineered storage facility.

Property and Receiving Warehouse Building - The work includes the construction of a single-story metal building with a mezzanine floor, including concrete slab, brick veneer front, concrete masonry units, vinyl plank flooring, resinous flooring, hollow metal doors and frames, overhead doors, windows, gypsum board wall panels, cabinets, ceramic tile, painting, suspended acoustic ceilings; lighting and electrical; mechanical, plumbing, site work, concrete paving, etc., as shown on the drawings and as required to complete the work. All Inquires Must Be Received by: October 25, 2024. Written inquiries must be received in the Grambling State University Purchasing Department no later than five (5) calendar days prior to the opening of bids, and shall be clearly cross-referenced to the relevant solicitation/specification in question. Bid Bonds: If a bid bond is required on ALL Public Works Project over $25,000, a bid bond must be submitted for each separate bid response. The bid bond shall be in an amount equal to 5% of the bid price submitted and alternates, if any. The bid security shall be in a form of a bid bond or certified check, or cashier's check. COMPLETION TIME: The Bidder hereby agrees to commence work under this Contract on a date specified in a written "Notice To Proceed" by the Owner and to fully complete the project within (365) consecutive calendar days thereafter, or within the time as may be extended as stipulated in the Contract Documents. LIQUIDATED DAMAGES: The Bidder hereby also agrees to pay as Liquidated Damages the sum of Three Hundred Dollars ($300.00) for each consecutive calendar day which the work is not complete beginning with the first day beyond the completion time stated above. Grambling State University reserves the right to award items separately, grouped or on an all or none basis and to reject any or all bids and waive any informalities.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$1,000,000.00

Public - State/Provincial

Renovation

31

18

20

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
7
Bidding Soon
154
All Active Projects
84
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

January 6, 2025

img_map_placeholder

To Be Determined, Grambling, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.