BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Independence, Missouri. Completed plans call for site work for a water / sewer project.

The City of Independence, Missouri Water Division invites bids from firms to perform services through following the attached scope of work at the Courtney Bend Water Treatment Plant. The contract for this project shall provide for, but not be limited to, all equipment, materials, and workmanship required for the removal, inspection, refurbishment, delivery, installation, and startup of one (1) vertical line shaft turbine pump ("reclaim pump no.1") assembly. The assembly includes 1) 3 phase, 480v electric motor. The Water Department desires to refurbish this existing pump assembly to ensure operational reliability. Please submit all questions regarding this Invitation to Bid online The City of Independence, Missouri Water Department invites bids from firms meeting the qualifications set forth herein and in referenced documents to perform the following scope of work at the Courtney Bend Water Treatment Plant for the Water Department. The contract for this project shall provide for, but not be limited to, all equipment, materials, and workmanship required for the removal, inspection, refurbishment, delivery, installation, and startup of one (1) vertical line shaft turbine pump ("reclaim pump no.l") assembly. The assembly includes 1) 3 phase, 480v electric motor. The Water Department desires to refurbish this existing pump assembly to ensure operational reliability. The scope of work to be completed by the successful bidder shall be further defined by the following: Line Item No. 1) Provide for all workmanship, manufactured equipment, manufactured goods, and materials as required and as specified for complete refurbishment of the existing vertical line shaft pump assembly and it's motor. This line item work shall be completed by the Bidder as a lump sum "turn-key" project, including but not limited to removal, transportation, disassembly, cleaning, inspection, testing, rebuilding, installation, startup, and testing of the existing assembly

Post-Bid

Water / Sewer

$34,376.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
39
Bidding Soon
767
All Active Projects
359
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

img_map_placeholder

14700 Cement City Rd, Independence, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.