BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Renovation of a parking garage in Saint Charles, Missouri. Completed plans call for the renovation of a parking garage.

Scope of Work Construction & Mechanic Shop Garage Door Replacement The Contractor shall provide labor & materials to complete the following: 1. Remove (5) 12’x10’1” and (1) 16’x10’1” doors and all associated hardware and weatherstripping. Demolished material to be properly disposed of, off site. 2. Supply and install (5) manual open 12’ x 10’ 1”, brown in color (Match Color as closely as possible to existing, Owner to approve) insulated sectional doors. o Standard lift, minimum of 24-gauge steel exterior, brown in color. o 14ga hinges and 16ga 2” track (15-degree radius) with continuous jamb angle. o 18-gauge center stile and ends. o Horizontal track to be reinforced with 13-gauge angle according to size and weight. o Install track stop spring bumpers on all manual open doors. o Install vinyl weather strip on all doors. o Install centered locking hardware with dual locking bars. o The Garage Doors shall be sandwich insulated to a R- value* no less than r14 3. Supply and install (1) trolley operated 16’ x 10’ 1”, with windows, Minimum of 25-gauge steel exterior, brown in color (Match Color as closely as possible to existing, Owner to approve). o Minimum of 24-gauge steel exterior, brown in color. o Install approved electric opener with push button, keypad, and remote function. (see section below) o 14ga hinges and 14ga 2” track with continuous jamb angle. o 18-gauge center stile and ends. o Case hardened steel tire rollers, 10 ball bearing, on long solid shaft. o Horizontal track to be reinforced with 13-gauge angle according to size and weight. o Install track stop spring bumpers on all manual open doors. o Install vinyl weather strip on all doors. o Install centered locking hardware with dual locking bars. o The Garage Doors shall be sandwich insulated to a R- value* no less than r14. 4. Supply and install (1) Liftmaster MT Series Logic Trolley garage door operator or approved equivalent. o The operator to be a minimum of ½ HP, 115V single-phase motor with instant reverse, capacitor start and overload protection. o Supply and install (1) 3-button station, for open/close/stop functions. o Provide at least (4) dip-switch remote transmitters.

Award

Parking Garage

$44,703.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
95
Bidding Soon
1,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

2360 Hwy D, Saint Charles, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.