Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 2, 2025 at 7:00 PM
Updated January 3, 2025
Renovation of a residential development in Saint Charles, Missouri. Completed plans call for the renovation of a residential development.
As of January 2, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Any questions or clarifications concerning this Request for Bid must be submitted in writing via E-mail (preferred), mail or fax to: Donna Clayton Finance Department, St. Charles County Government 201 North Second St St. Charles, Missouri 63301 Fax: (636)949-7589 DClayton@sccmo.org For questions or inquiries concerning the specifications please contact: Brian Cox Facilities Management Department, St Charles County Government 300 North Second St, Room 101 St. Charles, Missouri 63301 BCox@sccmo.org All questions must be received Any question received after this deadline may not be answered. Responses to questions/clarifications will be placed on the County's website Question Deadline 10/18/2024 at 2:00 PM CT Charles County reserves the right to accept and/or reject any and all bids. St. Charles County Government Facilities Management Department is seeking bids for the procurement and installation of a partial mechanical system at the Highway Department located at 301 N. 3 rd . St. IN St. Charles, MO 63301. This project has been designed by Horner & Shifrin and construction document sets have been provided within this bid package. Mechanical: The equipment schedule within the drawings can be substituted with an equivalent make/model that meets the same performance specifications. If an equivalent is submitted in lieu of the specifications, the contractor must include a note of all changes on the exception sheet of the bid documents and verify that the submitted equipment will work with the existing system. Demolish various sections of diffusers, associated controls, and branch ductwork in accordance with mechanical drawings. Install four (4) air devices in accordance with mechanical drawings. A total of ten (10) VAV Boxes are to be installed with disconnects, SCR controls, and BACnet Cards in accordance with mechanical drawings. Ductwork for supply and return air is to be demoed and reworked in accordance with mechanical drawings.
Bid Results
Residential Subdivision
$117,463.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2024
November 25, 2024
301 S 3rd St, Saint Charles, MO
Related To This Project
Saint Charles, MO
Bid Date: Oct 24 2024
Saint Charles, MO
Bid Date: Nov 13 2024
Saint Charles, MO
Bid Date: Nov 08 2024
Saint Charles, MO
Bid Date: Nov 26 2024
Saint Charles, MO
--
Saint Charles, MO
Bid Date: Dec 04 2024
Saint Charles, MO
Bid Date: Nov 18 2024
Saint Charles, MO
Bid Date: Dec 17 2024
Saint Charles, MO
Bid Date: Oct 17 2024
Saint Charles, MO
Bid Date: Nov 12 2024
Saint Charles, MO
Bid Date: Oct 14 2024
Saint Charles, MO
Bid Date: Mar 18 2025
Saint Charles, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
