BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Renovation of a water / sewer project in Little Ferry, New Jersey. Working plans call for the renovation of a water / sewer project.

** As of September 2, 2025 bids received was rejected. No definite date for rebid.** Contract No. C214 Scope of Work Includes, but is Not Limited to: 1. Installation of the New Six (6) Section Modular Chiller That Has Been Pre-purchased by the Owner in Accordance With the Construction Documents and All Manufacturer Requirements, 2. Installation of a New Refrigerant Detection and Exhaust System Specific for the Existing and New Refrigerants in Use at the Facility, 3. The Refurbishment of the Two (2) Existing Cooling Tower Cells by a Manufacturer Approved Restoration Company, 4. All Related and Ancillary Work Including Piping, Duct Work, Supports, Controls, Etc. As Required for a Complete and Fully Operational Plant, 5. Hvac Demolition Work as Specified in the Contract Documents, 6. Testing, Adjusting, and Balancing of All Hvac Systems Including Exhaust and Supply Fans, Registers and Grilles, and Hydronic Systems Including Cooling Coils and Control Valves, 7. Installation of Hvac Piping Insulation and Identification Systems for Piping and Equipment, 8. Installation of Hydronic Piping Systems Including Hot-water Heating, Chilled-water, Dual-temperature Heating and Cooling Water, and Condenser-water Piping, 9. Installation of Hvac Fans Including Belt Drive Mixed Flow Inline Fans as Specified. Bidder Shall Submit With the Bid an Electronic Bid Bond or Electronic Copy of a Bid Bond in the Amount of Ten Percent (10%) of the Total Price Bid, but Not in Excess of $20,000.00, Payable Unconditionally to the Bergen County Utilities Authority, Along With a Certificate (Consent of Surety) With Power of Attorney for the Full Amount of the Bid Price From a Surety Company Authorized to Do Business in the State of New Jersey and Said Surety Will Furnish a Consolidated Performance and Payment Bond in Amounts of 100% of the Successful Bidder's Contract. If the Bidder is to Submit a Certified Check, or Cashier's Check

Final Planning

Water / Sewer

$20,000,000.00

Public - County

Renovation

18

5

4

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
985
Active Projects
450
Bidding Soon
6,678
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

March 2, 2026

Project location map

298 Mehrhof Rd, Little Ferry, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.